SLEEVE,SHAFT,MODEL LQ969,NBR
Material 4100008911 · SLEEVE · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100008911
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 135 d · P80 210 d
- Unit price
- Rp 8.1M (est.)
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~135 days; expected demand during lead time 0.3.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 24.3M · order by 01 Oct 2026
Expected arrival ≈ 135 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 2%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 285 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 810.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1383 PROPYLENE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1253B LUBE OIL PUMP | B | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Mar 2026 | Medium | PX_PP-1253B | PP-1253B seal leak |
| 08 May 2025 | Low | PX_PP-1253B | PP-1253B seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Dec 2025 | 1 | 201000015497 | Corrective |
| 26 May 2025 | 2 | 201000012024 | Corrective |