SLEEVE,SHAFT,TYPE AG399,INCOLOY

Material 4100008941 · SLEEVE · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100008941
Category
SLEEVE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
126 d · P80 210 d
Unit price
Rp 5.2M

Recommendation

  • 1.Forecast 1.7 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~126 days; expected demand during lead time 1.0 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 20.8M · order by 01 Oct 2026
Expected arrival ≈ 126 days
Long-leadSingle sourcePlanned demand in lead time
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 4%
Unit price
Rp 5.2M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 62 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 3 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-508D
FEED PUMP
A100.19
PX_PP-1404A
DEMIN WATER PUMP
C200.19
PX_PP-298C
FLUSHING OIL PUMP
S131.47

Lead time and procurement

Lead time 126 ± 55 days (PO history + category, 1 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
17 May 2025PR03
Regular replenishment
2Rp 5.2M23 Aug 202598 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Jan 2027PX_PP-508DPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Jul 2026MediumPX_PP-298CReplace lamp as per PM finding
27 Jun 2026LowPX_PP-298COil leak at PP-298C bearing housing
31 Jul 2025LowPX_PP-298CPP-298C abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
31 Jul 20261201000025482Corrective