SLEEVE,SHAFT,MODEL QM386,SS316
Material 4100009455 · SLEEVE · Plant 1000
ALong-leadMaintainHealthy
- Material
- 4100009455
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 144 d · P80 174 d
- Unit price
- Rp 7.0M
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~144 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 174 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 2
next delivery 21 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 7.0M
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 111.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1819A SLOP OIL PUMP | A | 1 | 5 | 1.90 |
Lead time and procurement
Lead time 144 ± 48 days (PO history, 3 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Jun 2026 | PR06 Regular replenishment | 2 | Rp 7.0M | 21 Dec 2026 open | 200 d |
| 28 Jan 2026 | PR01 Import / long-lead | 1 | Rp 6.8M | 12 Jun 2026 | 135 d |
| 27 Aug 2025 | PR03 Regular replenishment | 1 | Rp 7.1M | 27 Dec 2025 | 122 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jul 2026 | Medium | PX_PP-1819A | PP-1819A abnormal noise |
| 21 Jun 2026 | Low | PX_PP-1819A | [MSI-B-26-NPM-141] Permanent repair |
| 18 May 2026 | High | PX_PP-1819A | PP-1819A seal leak |
| 29 Nov 2025 | Low | PX_PP-1819A | Leak from packing |
| 27 May 2025 | Medium | PX_PP-1819A | PP-1819A high vibration |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Jun 2026 | 1 | 203000002440 | Turnaround |
| 04 Jun 2026 | 1 | 203000002440 | Turnaround |