SLEEVE,SHAFT,SIZE NP593,VITON
Material 4100009852 · SLEEVE · Plant 1000
BLong-leadReorderNormalBelow reorder point
- Material
- 4100009852
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- PRIMA ELEKTRIK ABADI PT
- Lead time
- 167 d · P80 210 d
- Unit price
- Rp 21.2M
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~167 days; expected demand during lead time 0.2.
- 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
- 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 21.2M · order by 01 Oct 2026
Expected arrival ≈ 167 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.3%
stockout risk now 2%
Unit price
Rp 21.2M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 98 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 152.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1939 BFW PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 167 ± 55 days (PO history + category, 1 PO lines) · on-time 30%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Dec 2025 | PR05 Project / turnaround | 2 | Rp 21.2M | 28 Aug 2026 | 261 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jun 2026 | 1 | 201000038239 | Corrective |