Sparely
DU

SLEEVE,SHAFT,MODEL ZR109,SS304

Material 4100010129 · SLEEVE · Plant 1000

BMonitorInsurance gap
Material
4100010129
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
B (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~135 days; expected demand during lead time 0.0.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.1%
stockout risk now 1%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-350A
REFLUX PUMP
B120.19
PX_PP-311C
REFLUX PUMP
B100.19
PX_PP-251A
SPENT CAUSTIC PUMP
C110.19

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Jun 2026MediumPX_PP-350AInstall scaffolding at PP-350A
22 May 2025MediumPX_PP-251APP-251A abnormal noise
10 May 2025MediumPX_PP-350APSM25/PP-350A abnormal noise

Recent goods issues

Never issued in the 17-month history.