Sparely
DU

COUPLING,TYPE RD822,A105

Material 4100010526 · COUPLING · Plant 1000

AReorderCriticalStockout
Material
4100010526
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (38 of 50 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 12 SET/year: 12 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~86 days; expected demand during lead time 2.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 15.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 15 now.
  • 5.Installed on 50 FuncLoc(s), 38 of them criticality A/B.
  • 6.ML early warning: 52% probability of demand in the next 90 days.
Proposed purchase requisition
15 SET
Rp 128.3M · order by 01 Oct 2026
Expected arrival ≈ 86 days
ML early warningConvert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 8
Rec. Max
15
order qty 5
Service level
99.9%
stockout risk now 90%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 52% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 11 days ago, 24 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 50 functional locations

38 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-717
FLUSHING OIL COMPRESSOR
A194.00
PX_KC-732D
METHANOL COMPRESSOR
A163.14
PX_PP-888A
CONDENSATE PUMP
A361.90
PX_KC-447
LUBE OIL COMPRESSOR
A141.85
PX_KC-778A
CONDENSATE COMPRESSOR
A131.43
PX_KC-106B
GASOLINE BLOWER
A121.00
PX_KC-137A
C4 PRODUCT COMPRESSOR
A121.43
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_KC-391D
QUENCH WATER COMPRESSOR
A121.43
PX_KC-464A
CONDENSATE BLOWER
A121.43
PX_KC-801
DEMIN WATER FAN
A121.43
PX_PP-251C
RICH AMINE PUMP
A321.05

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-1892BReplace lamp as per PM finding
26 Sept 2026MediumPX_KC-365CKC-365C lube oil filter DP high
23 Sept 2026MediumPX_PP-1892BPP-1892B abnormal noise
22 Sept 2026MediumPX_PP-888AOil leak at PP-888A bearing housing
21 Sept 2026LowPX_KC-717Leak from packing
21 Sept 2026MediumPX_KC-843Painting KC-843
16 Sept 2026LowPX_KC-843Inspect coupling KC-843
05 Sept 2026LowPX_PP-1899Painting PP-1899
29 Aug 2026MediumPX_KC-843Replace lamp as per PM finding
26 Aug 2026MediumPX_KC-843[MSI-B-26-RLH-211] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
20 Sept 20261201000036455Corrective
17 Sept 20261201000015263Corrective
03 Feb 20262201000016884Corrective
03 Nov 20251201000005391Corrective
02 Nov 20251201000005391Corrective