COUPLING,SIZE SG630,MONEL

Material 4100010573 · COUPLING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100010573
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (12 of 14 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
100 d · P80 139 d
Unit price
Rp 5.3M

Recommendation

  • 1.Forecast 6.1 SET/year: 5.4 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~100 days; expected demand during lead time 1.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 12.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 12 now.
  • 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 14 FuncLoc(s), 12 of them criticality A/B.
  • 7.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
12 SET
Rp 63.4M · order by 01 Oct 2026
Expected arrival ≈ 100 days
Long-leadML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
12
order qty 5
Service level
99.9%
stockout risk now 67%
Unit price
Rp 5.3M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 261 days ago, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 14 functional locations

12 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-222B
LEAN AMINE COMPRESSOR
A451.85
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_KC-447
LUBE OIL COMPRESSOR
A141.85
PX_KC-464A
CONDENSATE BLOWER
A121.43
PX_KC-801
DEMIN WATER FAN
A121.43
PX_PP-882A
CONDENSATE PUMP
A110.62
PX_KC-250D
PROPYLENE FAN
A100.57
PX_KC-930C
SLOP OIL FAN
A100.57
PX_PP-1101A
REFLUX PUMP
A100.19
PX_PP-494C
METHANE PUMP
B183.62
PX_PP-1516
METHANOL PUMP
B120.62
PX_PP-731
BFW PUMP
B110.19

Lead time and procurement

Lead time 100 ± 54 days (PO history + category, 2 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
27 Apr 2026PR06
Regular replenishment
1Rp 5.2M13 Jul 202677 d
25 May 2025PR06
Regular replenishment
2Rp 5.4M05 Nov 2025164 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jul 2027PX_PP-135APump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Sept 2026LowPX_KC-730Overhaul
10 Sept 2026MediumPX_KC-479CKC-479C bearing temp high
10 Sept 2026MediumPX_PP-494COverhaul PP-494C
18 Aug 2026LowPX_KC-479CLeak from packing
17 Aug 2026MediumPX_KC-447Leak from packing
28 Jul 2026HighPX_PP-494CReplace lamp as per PM finding
14 Jul 2026MediumPX_KC-730Leak from packing
07 Jul 2026MediumPX_KC-447Replace lamp as per PM finding
02 Jul 2026HighPX_KC-222BReplace lamp as per PM finding
31 May 2026MediumPX_KC-479C[MSI-B-26-KNK-222/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
13 Jan 20262201000014126Corrective
07 Jan 20261206000027736Other maintenance
23 Nov 20251201000034542Corrective