COUPLING,TYPE EZ965,INCOLOY

Material 4100010600 · COUPLING · Plant 1000

AMonitorInsurance gap
Material
4100010600
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (8 of 13 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 0.4 SET/year: 0.4 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~86 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 13 FuncLoc(s), 8 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 10%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 396.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 13 functional locations

8 with criticality A/B · 15 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-207
INHIBITOR PUMP
A131.47
PX_PP-283B
BFW PUMP
A131.47
UT_PP-641A
PROPYLENE PUMP
A131.05
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_PP-1882C
RECYCLE ETHANE PUMP
A120.62
PX_PP-1101A
REFLUX PUMP
A100.19
PX_KC-371B
BOTTOM FAN
B100.57
PX_PP-1872B
SPENT CAUSTIC PUMP
B100.19
PX_PP-778A
ETHYLENE PUMP
C110.19
PX_PP-1706A
LEAN AMINE PUMP
C100.19
PX_KC-730
ETHYLENE COMPRESSOR
S141.85
PX_PP-411A
CONDENSATE PUMP
S321.05

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_PP-411AReplace bearing PP-411A
16 Sept 2026MediumUT_PP-641AReplace lamp as per PM finding
13 Sept 2026LowPX_KC-730Overhaul
03 Sept 2026LowPX_PP-283BLeak from packing
15 Jul 2026MediumUT_PP-641AReplace lamp as per PM finding
14 Jul 2026MediumPX_KC-730Leak from packing
27 May 2026MediumPX_PP-207Leak from packing
09 Dec 2025MediumPX_PP-1882C[MSI-B-25-LFS-262/M] Replace line
11 Nov 2025MediumPX_KC-235DLeak from packing
01 Nov 2025MediumPX_PP-207PP-207 abnormal noise

Recent goods issues

Never issued in the 17-month history.