COUPLING,SIZE XR576,A182F11
Material 4100010604 · COUPLING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100010604
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (9 of 11 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 4.1 SET/year: 3.4 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~86 days; expected demand during lead time 0.8.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 11 FuncLoc(s), 9 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 42.8M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
99.9%
stockout risk now 5%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 309 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 11 functional locations
9 with criticality A/B · 13 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1530 PROPYLENE PUMP | A | 1 | 4 | 1.47 |
| PY_PP-1056 QUENCH WATER PUMP | A | 1 | 3 | 1.05 |
| PX_PP-638A BOTTOM PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1033 CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-956A CAUSTIC PUMP | A | 3 | 0 | 0.19 |
| PX_PP-1155C CONDENSATE PUMP | B | 1 | 9 | 3.19 |
| PX_PP-821 FEED PUMP | B | 1 | 2 | 0.62 |
| PX_PP-1448B ETHYLENE PUMP | B | 1 | 1 | 0.62 |
| PX_PP-210A HYDROGEN PUMP | B | 1 | 1 | 0.19 |
| PX_KC-422A C4 PRODUCT BLOWER | S | 1 | 6 | 2.71 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Jul 2027 | PX_PP-821 | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Jul 2026 | Medium | PX_PP-1530 | Replace bearing PP-1530 |
| 08 Jul 2026 | Medium | PX_KC-422A | KC-422A high vibration |
| 06 Jul 2026 | Medium | PX_PP-821 | Replace bearing PP-821 |
| 20 Jun 2026 | High | PX_PP-1155C | Overhaul PP-1155C |
| 20 May 2026 | Medium | PX_PP-1155C | PP-1155C discharge pressure low |
| 18 Apr 2026 | Medium | PX_PP-1155C | Leak from packing |
| 18 Mar 2026 | Medium | PX_PP-1155C | Install scaffolding at PP-1155C |
| 03 Mar 2026 | Low | PX_KC-422A | Leak from packing |
| 27 Jan 2026 | Medium | PX_PP-1155C | PP-1155C discharge pressure low |
| 27 Jan 2026 | Medium | PX_PP-1530 | Overhaul PP-1530 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Nov 2025 | 1 | 201000002839 | Corrective |