Sparely
DU

COUPLING,SIZE XR576,A182F11

Material 4100010604 · COUPLING · Plant 1000

AReorderNormalSlow-moving
Material
4100010604
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (9 of 11 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 4.1 SET/year: 3.4 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~86 days; expected demand during lead time 0.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 11 FuncLoc(s), 9 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 42.8M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
99.9%
stockout risk now 5%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 309 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 11 functional locations

9 with criticality A/B · 13 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1530
PROPYLENE PUMP
A141.47
PY_PP-1056
QUENCH WATER PUMP
A131.05
PX_PP-638A
BOTTOM PUMP
A110.19
PX_PP-1033
CAUSTIC PUMP
A100.19
PX_PP-956A
CAUSTIC PUMP
A300.19
PX_PP-1155C
CONDENSATE PUMP
B193.19
PX_PP-821
FEED PUMP
B120.62
PX_PP-1448B
ETHYLENE PUMP
B110.62
PX_PP-210A
HYDROGEN PUMP
B110.19
PX_KC-422A
C4 PRODUCT BLOWER
S162.71
PX_KC-150A
HYDROGEN FAN
S121.00

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jul 2027PX_PP-821Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Jul 2026MediumPX_PP-1530Replace bearing PP-1530
08 Jul 2026MediumPX_KC-422AKC-422A high vibration
06 Jul 2026MediumPX_PP-821Replace bearing PP-821
20 Jun 2026HighPX_PP-1155COverhaul PP-1155C
20 May 2026MediumPX_PP-1155CPP-1155C discharge pressure low
18 Apr 2026MediumPX_PP-1155CLeak from packing
18 Mar 2026MediumPX_PP-1155CInstall scaffolding at PP-1155C
03 Mar 2026LowPX_KC-422ALeak from packing
27 Jan 2026MediumPX_PP-1155CPP-1155C discharge pressure low
27 Jan 2026MediumPX_PP-1530Overhaul PP-1530

Recent goods issues

Posting dateQtyOrderOrder type
26 Nov 20251201000002839Corrective