COUPLING,SIZE FE254,SS316

Material 4100010618 · COUPLING · Plant 1000

AReorderCriticalStockout
Material
4100010618
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 4.2 SET/year: 4.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~86 days; expected demand during lead time 1.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
8 SET
Rp 68.4M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
99.9%
stockout risk now 63%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 81 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 7 functional locations

4 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1471A
METHANE PUMP
A141.47
PX_PP-1865A
METHANOL PUMP
A100.19
PX_PP-291D
RECYCLE ETHANE PUMP
B100.19
PX_PP-531B
ETHYLENE PUMP
B100.19
PX_KC-773A
REFLUX COMPRESSOR
S1259.99
PX_KC-879A
CONDENSATE FAN
S162.71
PX_PP-411A
CONDENSATE PUMP
S121.05

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026EmergencyPX_KC-773AInspect coupling KC-773A
24 Sept 2026LowPX_KC-879AInspect coupling KC-879A
17 Sept 2026MediumPX_PP-1471AReplace lamp as per PM finding
17 Sept 2026MediumPX_PP-411AReplace bearing PP-411A
15 Sept 2026LowPX_KC-773AInstall scaffolding at KC-773A
07 Sept 2026MediumPX_KC-879AReplace lamp as per PM finding
23 Aug 2026LowPX_KC-773AKC-773A bearing temp high
10 Aug 2026LowPX_KC-773AKC-773A high vibration
09 Aug 2026MediumPX_KC-773AInspect coupling KC-773A
03 Aug 2026MediumPX_KC-773ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
12 Jul 20261201000013975Corrective
17 Mar 20261201000019600Corrective
06 Jan 20261201000005301Corrective