COUPLING,SIZE FE254,SS316
Material 4100010618 · COUPLING · Plant 1000
AReorderCriticalStockout
- Material
- 4100010618
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (4 of 7 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 4.2 SET/year: 4.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~86 days; expected demand during lead time 1.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
- 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
8 SET
Rp 68.4M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
99.9%
stockout risk now 63%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 81 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 7 functional locations
4 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1471A METHANE PUMP | A | 1 | 4 | 1.47 |
| PX_PP-1865A METHANOL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-291D RECYCLE ETHANE PUMP | B | 1 | 0 | 0.19 |
| PX_PP-531B ETHYLENE PUMP | B | 1 | 0 | 0.19 |
| PX_KC-773A REFLUX COMPRESSOR | S | 1 | 25 | 9.99 |
| PX_KC-879A CONDENSATE FAN | S | 1 | 6 | 2.71 |
| PX_PP-411A CONDENSATE PUMP | S | 1 | 2 | 1.05 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Emergency | PX_KC-773A | Inspect coupling KC-773A |
| 24 Sept 2026 | Low | PX_KC-879A | Inspect coupling KC-879A |
| 17 Sept 2026 | Medium | PX_PP-1471A | Replace lamp as per PM finding |
| 17 Sept 2026 | Medium | PX_PP-411A | Replace bearing PP-411A |
| 15 Sept 2026 | Low | PX_KC-773A | Install scaffolding at KC-773A |
| 07 Sept 2026 | Medium | PX_KC-879A | Replace lamp as per PM finding |
| 23 Aug 2026 | Low | PX_KC-773A | KC-773A bearing temp high |
| 10 Aug 2026 | Low | PX_KC-773A | KC-773A high vibration |
| 09 Aug 2026 | Medium | PX_KC-773A | Inspect coupling KC-773A |
| 03 Aug 2026 | Medium | PX_KC-773A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Jul 2026 | 1 | 201000013975 | Corrective |
| 17 Mar 2026 | 1 | 201000019600 | Corrective |
| 06 Jan 2026 | 1 | 201000005301 | Corrective |