COUPLING,SIZE NF889,NBR
Material 4100010642 · COUPLING · Plant 1000
AReduceNon-moving
- Material
- 4100010642
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 3.2 SET/year: 0.3 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
- 2.Lead time ~86 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 5.
- 4.Stock 50 exceeds the level to keep (5) by 45.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
50 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
5
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 282.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 6 functional locations
4 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1970 FEED PUMP | A | 4 | 6 | 1.47 |
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_KC-669 DEMIN WATER BLOWER | A | 1 | 0 | 0.57 |
| PX_PP-1809B SEAL OIL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1659A ETHYLENE PUMP | C | 1 | 3 | 1.05 |
| PX_KC-422A C4 PRODUCT BLOWER | S | 1 | 6 | 2.71 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Jun 2027 | PX_PP-1970 | Pump overhaul | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 02 Sept 2026 | High | PX_PP-1970 | Overhaul PP-1970 |
| 28 Jul 2026 | Medium | PX_PP-1659A | Replace lamp as per PM finding |
| 09 Jul 2026 | Medium | PX_PP-1970 | Install scaffolding at PP-1970 |
| 08 Jul 2026 | Medium | PX_KC-422A | KC-422A high vibration |
| 17 May 2026 | Low | PX_KC-396 | Overhaul |
| 13 May 2026 | Low | PX_PP-1970 | PP-1970 seal leak |
| 04 May 2026 | Medium | PX_PP-1970 | PP-1970 seal leak |
| 16 Mar 2026 | Medium | PX_PP-1659A | Oil leak at PP-1659A bearing housing |
| 03 Mar 2026 | Low | PX_KC-422A | Leak from packing |
Recent goods issues
Never issued in the 17-month history.