Material 4100010687 · COUPLING · Plant 1000

AReorderCriticalSlow-moving
Material
4100010687
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
A (7 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 6.0 SET/year: 6.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~86 days; expected demand during lead time 1.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 12.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 11 now.
  • 5.Installed on 8 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
11 SET
Rp 94.1M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
12
order qty 4
Service level
99.9%
stockout risk now 51%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 8 functional locations

7 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-247A
SLOP OIL FAN
A194.00
PX_KC-316D
METHANOL FAN
A151.43
PX_KC-317B
RICH AMINE FAN
A141.85
PX_KC-396
WASH WATER BLOWER
A131.43
PX_PP-1575A
METHANE PUMP
A110.19
PX_PP-1363
CAUSTIC PUMP
A100.19
PX_PP-1865A
METHANOL PUMP
A100.19
PX_KC-236B
DILUTION STEAM FAN
S110.57

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_KC-396Replace lamp as per PM finding
27 Aug 2026HighPX_KC-247AInspect coupling KC-247A
10 Aug 2026MediumPX_KC-316DOverhaul
03 Aug 2026MediumPX_KC-316DPainting KC-316D
14 Jul 2026MediumPX_KC-247AReplace lamp as per PM finding
04 Jul 2026LowPX_KC-317BReplace lamp as per PM finding
29 Jun 2026LowPX_KC-247AKC-247A high vibration
04 Jun 2026LowPX_KC-247AKC-247A bearing temp high
17 May 2026LowPX_KC-396Overhaul
14 May 2026MediumPX_KC-316DKC-316D high vibration

Recent goods issues

Posting dateQtyOrderOrder type
19 Jan 20262201000021643Corrective