COUPLING,MODEL UF743,CS
Material 4100010687 · COUPLING · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100010687
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (7 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 6.0 SET/year: 6.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~86 days; expected demand during lead time 1.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 12.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 11 now.
- 5.Installed on 8 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
11 SET
Rp 94.1M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
12
order qty 4
Service level
99.9%
stockout risk now 51%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 8 functional locations
7 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-247A SLOP OIL FAN | A | 1 | 9 | 4.00 |
| PX_KC-316D METHANOL FAN | A | 1 | 5 | 1.43 |
| PX_KC-317B RICH AMINE FAN | A | 1 | 4 | 1.85 |
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_PP-1575A METHANE PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1363 CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1865A METHANOL PUMP | A | 1 | 0 | 0.19 |
| PX_KC-236B DILUTION STEAM FAN | S | 1 | 1 | 0.57 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 27 Aug 2026 | High | PX_KC-247A | Inspect coupling KC-247A |
| 10 Aug 2026 | Medium | PX_KC-316D | Overhaul |
| 03 Aug 2026 | Medium | PX_KC-316D | Painting KC-316D |
| 14 Jul 2026 | Medium | PX_KC-247A | Replace lamp as per PM finding |
| 04 Jul 2026 | Low | PX_KC-317B | Replace lamp as per PM finding |
| 29 Jun 2026 | Low | PX_KC-247A | KC-247A high vibration |
| 04 Jun 2026 | Low | PX_KC-247A | KC-247A bearing temp high |
| 17 May 2026 | Low | PX_KC-396 | Overhaul |
| 14 May 2026 | Medium | PX_KC-316D | KC-316D high vibration |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Jan 2026 | 2 | 201000021643 | Corrective |