COUPLING,SIZE YD428,PTFE
Material 4100010788 · COUPLING · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100010788
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 1.9 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~86 days; expected demand during lead time 1.0 (incl. 0.7 planned).
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 42.8M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 25%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 75 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 4 functional locations
3 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-235D DEMIN WATER FAN | A | 1 | 2 | 1.00 |
| PX_PP-769B CONDENSATE PUMP | A | 4 | 0 | 0.19 |
| PX_PP-1583A CAUSTIC PUMP | B | 1 | 2 | 0.62 |
| PX_KC-505D METHANE COMPRESSOR | S | 1 | 1 | 1.00 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PX_PP-1583A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Sept 2026 | Medium | PX_PP-1583A | Replace lamp as per PM finding |
| 11 Nov 2025 | Medium | PX_KC-235D | Leak from packing |
| 21 Jun 2025 | High | PX_KC-505D | Repair insulation KC-505D |
| 22 May 2025 | Low | PX_PP-1583A | [MSI-B-25-WEW-215] Permanent repair |
| 16 May 2025 | Low | PX_KC-235D | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Jul 2026 | 1 | 201000002283 | Corrective |