COUPLING,TYPE AR741,SS316
Material 4100010899 · COUPLING · Plant 1000
BMonitorInsurance gap
- Material
- 4100010899
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 0.2 SET/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~86 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 4%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 42.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.
Installed on 3 functional locations
2 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-679B METHANOL PUMP | B | 2 | 7 | 1.90 |
| PX_PP-1309C LUBE OIL PUMP | B | 3 | 2 | 0.62 |
| PX_PP-1872A QUENCH WATER PUMP | S | 1 | 4 | 1.90 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_PP-679B | Overhaul PP-679B |
| 20 Sept 2026 | Medium | PX_PP-679B | PP-679B seal leak |
| 28 Aug 2026 | Medium | PX_PP-1309C | [MSI-B-26-HPD-155] Permanent repair |
| 25 Aug 2026 | Medium | PX_PP-1872A | Oil leak at PP-1872A bearing housing |
| 22 Aug 2026 | Medium | PX_PP-679B | PP-679B high vibration |
| 19 Jul 2026 | Medium | PX_PP-679B | Install scaffolding at PP-679B |
| 29 Apr 2026 | Medium | PX_PP-1872A | PP-1872A discharge pressure low |
| 22 Dec 2025 | Medium | PX_PP-679B | Overhaul PP-679B |
| 28 Oct 2025 | Medium | PX_PP-679B | Install scaffolding at PP-679B |
| 17 Sept 2025 | Low | PX_PP-1872A | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.