COUPLING,SIZE AM24,A105
Material 4100010911 · COUPLING · Plant 1000
AReduceNon-moving
- Material
- 4100010911
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~86 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 42 exceeds the level to keep (2) by 40.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
42 / 0
no open PO
Today Min / Max
10 / 29
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 112.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-769B CONDENSATE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1070B FUEL OIL PUMP | B | 1 | 8 | 2.76 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | Medium | PX_PP-1070B | Leak from packing |
| 03 Sept 2026 | Medium | PX_PP-1070B | Repair insulation PP-1070B |
| 08 Jun 2026 | Medium | PX_PP-1070B | Overhaul PP-1070B |
| 04 Jun 2026 | Medium | PX_PP-1070B | Replace bearing PP-1070B |
| 19 Apr 2026 | Emergency | PX_PP-1070B | Repair insulation PP-1070B |
| 04 Nov 2025 | Medium | PX_PP-1070B | Install scaffolding at PP-1070B |
| 13 Oct 2025 | Medium | PX_PP-1070B | Replace lamp as per PM finding |
| 05 May 2025 | Low | PX_PP-1070B | PP-1070B discharge pressure low |
Recent goods issues
Never issued in the 17-month history.