COUPLING,SIZE AC401,A182F11
Material 4100010930 · COUPLING · Plant 1000
AReduceNon-moving
- Material
- 4100010930
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 0.9 SET/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~86 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 21 exceeds the level to keep (2) by 19.
- 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 139.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 4 functional locations
4 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-588 CAUSTIC FAN | A | 4 | 2 | 1.00 |
| PX_PP-807B INHIBITOR PUMP | A | 1 | 2 | 1.05 |
| PX_PP-640A SPENT CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_KC-284A WASH WATER COMPRESSOR | B | 1 | 2 | 1.43 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Mar 2027 | PX_PP-807B | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Sept 2026 | Medium | PX_PP-807B | Replace bearing PP-807B |
| 22 Feb 2026 | Medium | PX_KC-588 | KC-588 lube oil filter DP high |
| 04 Sept 2025 | Medium | PX_KC-284A | KC-284A lube oil filter DP high |
| 08 Jul 2025 | Medium | PX_KC-284A | KC-284A high vibration |
| 05 Jul 2025 | Low | PX_PP-807B | Replace bearing PP-807B |
| 24 May 2025 | Medium | PX_KC-588 | Repair insulation KC-588 |
Recent goods issues
Never issued in the 17-month history.