COUPLING,TYPE BD230,PTFE

Material 4100010946 · COUPLING · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100010946
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
MITRA SARANA INTERNASIONAL PT
Lead time
81 d · P80 139 d
Unit price
Rp 10.0M

Recommendation

  • 1.Forecast 1.2 SET/year: 0.5 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~81 days; expected demand during lead time 0.8 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
3 SET
Rp 29.9M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Long-leadML early warningSingle sourcePlanned demand in lead time
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 1%
Unit price
Rp 10.0M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 8 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 438.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 5 functional locations

5 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_KC-419A
PROPYLENE FAN
A1195.71
PX_KC-222B
LEAN AMINE COMPRESSOR
A151.85
PX_PP-139
CAUSTIC PUMP
A141.90
PX_KC-853D
SLOP OIL COMPRESSOR
B141.85
PY_PP-1584B
COOLING WATER PUMP
B100.19

Lead time and procurement

Lead time 81 ± 54 days (PO history + category, 2 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
21 Jun 2026PR06
Regular replenishment
1Rp 10.1M25 Sept 202696 d
01 Sept 2025PR03
Regular replenishment
2Rp 9.8M23 Oct 202552 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PY_PP-1584BPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026HighPY_KC-419AOverhaul
23 Sept 2026MediumPY_KC-419AInspect coupling KC-419A
18 Sept 2026MediumPY_KC-419AInstall scaffolding at KC-419A
31 Aug 2026MediumPY_KC-419AInstall cover plate for MCP cracking
28 Aug 2026MediumPY_KC-419AInstall scaffolding at KC-419A
12 Aug 2026HighPY_KC-419AKC-419A lube oil filter DP high
11 Aug 2026MediumPX_PP-139Oil leak at PP-139 bearing housing
09 Aug 2026MediumPX_PP-139Install cover plate for MCP cracking
11 Jul 2026MediumPY_KC-419AKC-419A lube oil filter DP high
09 Jul 2026MediumPY_KC-419AInstall scaffolding at KC-419A

Recent goods issues

Posting dateQtyOrderOrder type
19 Jan 20261204000020801Preventive