COUPLING,TYPE BD230,PTFE
Material 4100010946 · COUPLING · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100010946
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (5 of 5 FuncLocs A/B)
- Supplier
- MITRA SARANA INTERNASIONAL PT
- Lead time
- 81 d · P80 139 d
- Unit price
- Rp 10.0M
Recommendation
- 1.Forecast 1.2 SET/year: 0.5 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~81 days; expected demand during lead time 0.8 (incl. 0.7 planned).
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
- 7.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
3 SET
Rp 29.9M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Long-leadML early warningSingle sourcePlanned demand in lead time
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 1%
Unit price
Rp 10.0M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 8 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 438.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 5 functional locations
5 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-419A PROPYLENE FAN | A | 1 | 19 | 5.71 |
| PX_KC-222B LEAN AMINE COMPRESSOR | A | 1 | 5 | 1.85 |
| PX_PP-139 CAUSTIC PUMP | A | 1 | 4 | 1.90 |
| PX_KC-853D SLOP OIL COMPRESSOR | B | 1 | 4 | 1.85 |
| PY_PP-1584B COOLING WATER PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 81 ± 54 days (PO history + category, 2 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Jun 2026 | PR06 Regular replenishment | 1 | Rp 10.1M | 25 Sept 2026 | 96 d |
| 01 Sept 2025 | PR03 Regular replenishment | 2 | Rp 9.8M | 23 Oct 2025 | 52 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PY_PP-1584B | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | High | PY_KC-419A | Overhaul |
| 23 Sept 2026 | Medium | PY_KC-419A | Inspect coupling KC-419A |
| 18 Sept 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 31 Aug 2026 | Medium | PY_KC-419A | Install cover plate for MCP cracking |
| 28 Aug 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 12 Aug 2026 | High | PY_KC-419A | KC-419A lube oil filter DP high |
| 11 Aug 2026 | Medium | PX_PP-139 | Oil leak at PP-139 bearing housing |
| 09 Aug 2026 | Medium | PX_PP-139 | Install cover plate for MCP cracking |
| 11 Jul 2026 | Medium | PY_KC-419A | KC-419A lube oil filter DP high |
| 09 Jul 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Jan 2026 | 1 | 204000020801 | Preventive |