Sparely
DU

COUPLING,SIZE LN66,SS316

Material 4100010980 · COUPLING · Plant 1000

AReduceSlow-moving
Material
4100010980
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
MITRA PERKASA NUSANTARA PT
Lead time
74 d · P80 74 d
Unit price
Rp 20.6M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~74 days; expected demand during lead time 0.0.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 2 exceeds the level to keep (1) by 1.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Last turnaround used 1Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 20.6M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 43.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 2 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-155D
CAUSTIC BLOWER
A100.57
PX_KC-223
RECYCLE ETHANE FAN
A400.57

Lead time and procurement

Lead time 74 ± 37 days (PO history, 3 PO lines) · on-time 48%

PR dateTypeQtyUnit priceDeliveryLead time
07 Aug 2026PR03
Regular replenishment
2Rp 20.6M16 Sept 202640 d
10 Jun 2026PR04
Regular (other)
1Rp 20.6M28 Aug 202679 d
18 Feb 2026PR03
Regular replenishment
1Rp 21.7M25 Apr 202666 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
14 Nov 20251203000006868Turnaround
Sparely