COUPLING,SIZE LN66,SS316
Material 4100010980 · COUPLING · Plant 1000
AReduceSlow-moving
- Material
- 4100010980
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- MITRA PERKASA NUSANTARA PT
- Lead time
- 74 d · P80 74 d
- Unit price
- Rp 20.6M
Recommendation
- 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~74 days; expected demand during lead time 0.0.
- 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 2 exceeds the level to keep (1) by 1.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Last turnaround used 1Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 20.6M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 43.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 2 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-155D CAUSTIC BLOWER | A | 1 | 0 | 0.57 |
| PX_KC-223 RECYCLE ETHANE FAN | A | 4 | 0 | 0.57 |
Lead time and procurement
Lead time 74 ± 37 days (PO history, 3 PO lines) · on-time 48%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Aug 2026 | PR03 Regular replenishment | 2 | Rp 20.6M | 16 Sept 2026 | 40 d |
| 10 Jun 2026 | PR04 Regular (other) | 1 | Rp 20.6M | 28 Aug 2026 | 79 d |
| 18 Feb 2026 | PR03 Regular replenishment | 1 | Rp 21.7M | 25 Apr 2026 | 66 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Nov 2025 | 1 | 203000006868 | Turnaround |