COUPLING,MODEL CF785,PTFE
Material 4100011307 · COUPLING · Plant 1000
BLong-leadMaintainCritical insurance spare
- Material
- 4100011307
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 80 d · P80 139 d
- Unit price
- Rp 8.4M
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~80 days; expected demand during lead time 0.0.
- 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 23 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.7%
stockout risk now 0%
Unit price
Rp 8.4M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 14.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-473A CONDENSATE PUMP | B | 1 | 6 | 1.47 |
Lead time and procurement
Lead time 80 ± 54 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Sept 2026 | PR04 Regular (other) | 1 | Rp 8.5M | 23 Nov 2026 open | 63 d |
| 28 Jan 2026 | PR01 Import / long-lead | 2 | Rp 8.3M | 15 Apr 2026 | 77 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Sept 2026 | Medium | PX_PP-473A | Painting PP-473A |
| 12 Feb 2026 | Medium | PX_PP-473A | PP-473A abnormal noise |
| 21 Nov 2025 | Medium | PX_PP-473A | Overhaul PP-473A |
| 04 Oct 2025 | Low | PX_PP-473A | Install scaffolding at PP-473A |
| 03 Sept 2025 | Medium | PX_PP-473A | PP-473A seal leak |
| 04 May 2025 | Medium | PX_PP-473A | Oil leak at PP-473A bearing housing |
Recent goods issues
Never issued in the 17-month history.