COUPLING,TYPE XB496,A182F11
Material 4100011398 · COUPLING · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4100011398
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- ANUGRAH INSTRUMEN SENTOSA PT
- Lead time
- 68 d · P80 139 d
- Unit price
- Rp 3.8M
Recommendation
- 1.Forecast 3.9 SET/year: 3.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~68 days; expected demand during lead time 0.7.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
- 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 SET
Rp 30.8M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.4%
stockout risk now 30%
Unit price
Rp 3.8M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 454.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-570 METHANOL PUMP | B | 1 | 12 | 4.90 |
Lead time and procurement
Lead time 68 ± 54 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Nov 2025 | PR06 Regular replenishment | 1 | Rp 3.9M | 21 Dec 2025 | 43 d |
| 08 Oct 2025 | PR06 Regular replenishment | 2 | Rp 3.8M | 16 Nov 2025 | 39 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Sept 2026 | Medium | PX_PP-570 | PP-570 discharge pressure low |
| 22 Jul 2026 | Medium | PX_PP-570 | Install scaffolding at PP-570 |
| 29 Jun 2026 | Medium | PX_PP-570 | Replace bearing PP-570 |
| 30 Nov 2025 | Medium | PX_PP-570 | Install cover plate for MCP cracking |
| 30 Nov 2025 | Low | PX_PP-570 | Overhaul PP-570 |
| 30 Nov 2025 | Medium | PX_PP-570 | Oil leak at PP-570 bearing housing |
| 19 Nov 2025 | Medium | PX_PP-570 | PP-570 abnormal noise |
| 16 Nov 2025 | Medium | PX_PP-570 | PP-570 abnormal noise |
| 03 Nov 2025 | Medium | PX_PP-570 | PP-570 high vibration |
| 29 Oct 2025 | Medium | PX_PP-570 | Overhaul PP-570 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 2 | 201000006629 | Corrective |