COUPLING,SIZE XL932,A105
Material 4100011480 · COUPLING · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4100011480
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (2 of 2 FuncLocs A/B)
- Supplier
- DUTA ENERGI ABADI PT
- Lead time
- 98 d · P80 124 d
- Unit price
- Rp 2.7M
Recommendation
- 1.Forecast 1.7 SET/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~98 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 0 + on order 2 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 124 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 8.2M · order by 01 Oct 2026
Expected arrival ≈ 98 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 26 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 1%
Unit price
Rp 2.7M
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 222 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 396.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1678A METHANE PUMP | B | 1 | 1 | 0.19 |
| PX_PP-1939 BFW PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 98 ± 39 days (PO history, 3 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Jul 2026 | PR06 Regular replenishment | 2 | Rp 2.6M | 26 Nov 2026 open | 128 d |
| 21 Apr 2026 | PR05 Project / turnaround | 2 | Rp 2.7M | 16 Aug 2026 | 117 d |
| 22 Aug 2025 | PR06 Regular replenishment | 1 | Rp 2.8M | 12 Nov 2025 | 82 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 May 2025 | Low | PX_PP-1678A | Overhaul PP-1678A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Feb 2026 | 1 | 201000032205 | Corrective |
| 24 Jan 2026 | 1 | 201000029638 | Corrective |
| 23 Jan 2026 | 1 | 201000029638 | Corrective |
| 12 Dec 2025 | 1 | 201000012757 | Corrective |