COUPLING,TYPE NL50,A105
Material 4100011877 · COUPLING · Plant 1000
BLong-leadMaintainStockout
- Material
- 4100011877
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI TEKNIK PRATAMA PT
- Lead time
- 103 d · P80 139 d
- Unit price
- Rp 31.5M
Recommendation
- 1.Forecast 1.0 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~103 days; expected demand during lead time 0.3.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 4
next delivery 15 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 31.5M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 103 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 238.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-624A RECYCLE ETHANE BLOWER | B | 1 | 5 | 2.28 |
Lead time and procurement
Lead time 103 ± 54 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Jul 2026 | PR03 Regular replenishment | 2 | Rp 31.4M | 15 Oct 2026 open | 88 d |
| 20 May 2026 | PR03 Regular replenishment | 2 | Rp 31.5M | 03 Nov 2026 open | 167 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Aug 2026 | Medium | PX_KC-624A | KC-624A high vibration |
| 10 Aug 2026 | Medium | PX_KC-624A | Leak from packing |
| 18 Jun 2026 | Low | PX_KC-624A | Overhaul |
| 19 Feb 2026 | Medium | PX_KC-624A | Overhaul |
| 25 May 2025 | Low | PX_KC-624A | Repair insulation KC-624A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Jun 2026 | 1 | 201000017155 | Corrective |