Sparely
DU

COUPLING,MODEL DX942,VITON

Material 4100012176 · COUPLING · Plant 1000

CMonitorInsurance gap
Material
4100012176
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~86 days; expected demand during lead time 0.0.
  • 3.A 97.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.2%
stockout risk now 3%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~44 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1659A
ETHYLENE PUMP
C131.05
PX_KC-264A
C4 PRODUCT FAN
S151.85

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Jul 2026MediumPX_PP-1659AReplace lamp as per PM finding
12 Jul 2026LowPX_KC-264ALeak from packing
19 Apr 2026EmergencyPX_KC-264AInstall scaffolding at KC-264A
16 Mar 2026MediumPX_PP-1659AOil leak at PP-1659A bearing housing
30 Oct 2025LowPX_KC-264AInstall scaffolding at KC-264A
27 Sept 2025MediumPX_KC-264ALeak from packing
22 Jul 2025MediumPX_KC-264A[MSI-B-25-HVW-347/M] Replace line
19 May 2025MediumPX_PP-1659APP-1659A discharge pressure low

Recent goods issues

Never issued in the 17-month history.