RING,WEAR,TYPE II531,MONEL

Material 4100012299 · RING · Plant 1000

AReorderCriticalStockout
Material
4100012299
Category
RING
Base unit
EA
MRP type
Stock Item
Criticality
A (20 of 28 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 12 EA/year: 11 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~92 days; expected demand during lead time 3.5 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 17.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 17 now.
  • 5.Installed on 28 FuncLoc(s), 20 of them criticality A/B.
Proposed purchase requisition
17 EA
Rp 139.2M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 9
Rec. Max
17
order qty 5
Service level
99.9%
stockout risk now 100%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 253 days ago, 15 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 28 functional locations

20 with criticality A/B · 38 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-888A
CONDENSATE PUMP
A461.90
PX_PP-1862
HYDROGEN PUMP
A151.47
PX_PP-1022
QUENCH WATER PUMP
A131.47
PX_PP-1598B
FUEL OIL PUMP
A131.05
PX_PP-1121
DILUTION STEAM PUMP
A420.62
PX_PP-1194
FEED PUMP
A221.05
PX_PP-251C
RICH AMINE PUMP
A121.05
PX_PP-1099
LUBE OIL PUMP
A100.19
PX_PP-1363
CAUSTIC PUMP
A100.19
PX_PP-248B
RICH AMINE PUMP
A100.19
PX_PP-891C
CHARGE GAS PUMP
A100.19
PX_PP-390B
SLOP OIL PUMP
B1197.04

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_PP-1583APump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_PP-888AOil leak at PP-888A bearing housing
15 Sept 2026MediumPX_PP-1583AReplace lamp as per PM finding
10 Sept 2026MediumPX_PP-494COverhaul PP-494C
02 Sept 2026MediumPX_PP-1768CReplace lamp as per PM finding
02 Sept 2026LowPX_PP-390BPP-390B high vibration
26 Aug 2026MediumPX_PP-1121Oil leak at PP-1121 bearing housing
25 Aug 2026MediumPX_PP-390BPP-390B seal leak
22 Aug 2026MediumPX_PP-601Replace bearing PP-601
21 Aug 2026MediumPX_PP-390BInstall scaffolding at PP-390B
16 Aug 2026HighPX_PP-888APP-888A abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
21 Jan 20261201000006322Corrective
14 Jun 20252201000018892Corrective
13 Jun 20252204000029365Preventive