RING,WEAR,TYPE II531,MONEL
Material 4100012299 · RING · Plant 1000
AReorderCriticalStockout
- Material
- 4100012299
- Category
- RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (20 of 28 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 92 d · P80 143 d
- Unit price
- Rp 8.2M (est.)
Recommendation
- 1.Forecast 12 EA/year: 11 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~92 days; expected demand during lead time 3.5 (incl. 0.7 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 17.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 17 now.
- 5.Installed on 28 FuncLoc(s), 20 of them criticality A/B.
Proposed purchase requisition
17 EA
Rp 139.2M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 9
Rec. Max
17
order qty 5
Service level
99.9%
stockout risk now 100%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 253 days ago, 15 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.
Installed on 28 functional locations
20 with criticality A/B · 38 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-888A CONDENSATE PUMP | A | 4 | 6 | 1.90 |
| PX_PP-1862 HYDROGEN PUMP | A | 1 | 5 | 1.47 |
| PX_PP-1022 QUENCH WATER PUMP | A | 1 | 3 | 1.47 |
| PX_PP-1598B FUEL OIL PUMP | A | 1 | 3 | 1.05 |
| PX_PP-1121 DILUTION STEAM PUMP | A | 4 | 2 | 0.62 |
| PX_PP-1194 FEED PUMP | A | 2 | 2 | 1.05 |
| PX_PP-251C RICH AMINE PUMP | A | 1 | 2 | 1.05 |
| PX_PP-1099 LUBE OIL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1363 CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-248B RICH AMINE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-891C CHARGE GAS PUMP | A | 1 | 0 | 0.19 |
| PX_PP-390B SLOP OIL PUMP | B | 1 | 19 | 7.04 |
Lead time and procurement
Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PX_PP-1583A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Medium | PX_PP-888A | Oil leak at PP-888A bearing housing |
| 15 Sept 2026 | Medium | PX_PP-1583A | Replace lamp as per PM finding |
| 10 Sept 2026 | Medium | PX_PP-494C | Overhaul PP-494C |
| 02 Sept 2026 | Medium | PX_PP-1768C | Replace lamp as per PM finding |
| 02 Sept 2026 | Low | PX_PP-390B | PP-390B high vibration |
| 26 Aug 2026 | Medium | PX_PP-1121 | Oil leak at PP-1121 bearing housing |
| 25 Aug 2026 | Medium | PX_PP-390B | PP-390B seal leak |
| 22 Aug 2026 | Medium | PX_PP-601 | Replace bearing PP-601 |
| 21 Aug 2026 | Medium | PX_PP-390B | Install scaffolding at PP-390B |
| 16 Aug 2026 | High | PX_PP-888A | PP-888A abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Jan 2026 | 1 | 201000006322 | Corrective |
| 14 Jun 2025 | 2 | 201000018892 | Corrective |
| 13 Jun 2025 | 2 | 204000029365 | Preventive |