Sparely
DU

RING,WEAR,MODEL BL990,MONEL

Material 4100012338 · RING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100012338
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
A (15 of 18 FuncLocs A/B)
Supplier
BERKAH LOGAM GLOBAL PT
Lead time
104 d · P80 143 d
Unit price
Rp 3.8M

Recommendation

  • 1.Forecast 4.3 EA/year: 3.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~104 days; expected demand during lead time 1.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 18 FuncLoc(s), 15 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 37.6M · order by 01 Oct 2026
Expected arrival ≈ 104 days
Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
10
order qty 5
Service level
99.9%
stockout risk now 64%
Unit price
Rp 3.8M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 252 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 18 functional locations

15 with criticality A/B · 24 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-902B
BFW PUMP
A182.33
PX_PP-1735
SPENT CAUSTIC PUMP
A141.47
PX_PP-408B
METHANE PUMP
A441.90
PX_PP-149
RECYCLE ETHANE PUMP
A121.05
PY_PP-1862B
FLUSHING OIL PUMP
A420.62
PX_PP-882A
CONDENSATE PUMP
A110.62
PX_PP-1033
CAUSTIC PUMP
A100.19
PX_PP-1945D
BOTTOM PUMP
A100.19
PX_PP-912B
BOTTOM PUMP
A100.19
PY_PP-835B
METHANE PUMP
A100.19
PX_PP-1577D
ETHYLENE PUMP
B121.05
PX_PP-1782B
LUBE OIL PUMP
B110.19

Lead time and procurement

Lead time 104 ± 40 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
06 Feb 2026PR06
Regular replenishment
2Rp 3.8M10 Jun 2026124 d
19 Sept 2025PR06
Regular replenishment
1Rp 3.8M15 Jan 2026118 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Mar 2027PX_PP-1744Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026MediumPX_PP-1577DReplace bearing PP-1577D
23 Aug 2026EmergencyPX_PP-149PP-149 abnormal noise
21 Aug 2026LowPX_PP-254APP-254A high vibration
01 Aug 2026MediumPX_PP-408B[MSI-B-26-NMP-200/M] Replace line
18 Jul 2026LowPX_PP-902BReplace lamp as per PM finding
04 Jul 2026MediumPY_PP-1862B[MSI-B-26-MNG-333/M] Replace line
02 Mar 2026MediumPX_PP-902BInstall scaffolding at PP-902B
26 Feb 2026MediumPX_PP-902BInstall cover plate for MCP cracking
22 Feb 2026MediumPX_PP-1366APP-1366A high vibration
11 Feb 2026MediumPX_PP-408BReplace bearing PP-408B

Recent goods issues

Posting dateQtyOrderOrder type
22 Jan 20261201000014244Corrective