RING,WEAR,TYPE AN28,GRAPHITE

Material 4100012371 · RING · Plant 1000

AReorderNormalSlow-moving
Material
4100012371
Category
RING
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~92 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 32.7M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 4%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 397 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 4 functional locations

4 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-278
FEED PUMP
A162.33
PY_PP-1056
QUENCH WATER PUMP
A431.05
PX_PP-1309C
LUBE OIL PUMP
B120.62
PX_PP-210A
HYDROGEN PUMP
B110.19

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Aug 2026MediumPX_PP-1309C[MSI-B-26-HPD-155] Permanent repair
09 May 2026MediumPX_PP-278PP-278 seal leak
04 May 2026MediumPX_PP-278Replace bearing PP-278
09 Feb 2026LowPX_PP-278Replace lamp as per PM finding
17 Dec 2025HighPY_PP-1056[MSI-B-25-SWZ-286] Permanent repair
19 Oct 2025LowPX_PP-278PP-278 discharge pressure low
03 Oct 2025MediumPX_PP-278PP-278 abnormal noise
22 Sept 2025MediumPY_PP-1056PP-1056 abnormal noise
18 May 2025MediumPX_PP-1309CReplace lamp as per PM finding
13 May 2025LowPY_PP-1056Oil leak at PP-1056 bearing housing

Recent goods issues

Posting dateQtyOrderOrder type
30 Aug 20251201000032738Corrective