RING,WEAR,MODEL KD224,CS
Material 4100012394 · RING · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100012394
- Category
- RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (10 of 11 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 92 d · P80 143 d
- Unit price
- Rp 8.2M (est.)
Recommendation
- 1.Forecast 5.5 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
- 2.Lead time ~92 days; expected demand during lead time 1.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 10 now.
- 5.Installed on 11 FuncLoc(s), 10 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 81.9M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
11
order qty 4
Service level
100.0%
stockout risk now 54%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 4 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.
Installed on 11 functional locations
10 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1882C RECYCLE ETHANE PUMP | A | 1 | 2 | 0.62 |
| PX_PP-807B INHIBITOR PUMP | A | 1 | 2 | 1.05 |
| PX_PP-339A METHANE PUMP | B | 1 | 6 | 2.33 |
| PX_PP-473A CONDENSATE PUMP | B | 1 | 6 | 1.47 |
| PX_PP-1225B INHIBITOR PUMP | B | 1 | 2 | 0.62 |
| PX_PP-958B SEAL OIL PUMP | B | 1 | 2 | 0.62 |
| PX_PP-1299 QUENCH OIL PUMP | B | 4 | 1 | 0.62 |
| PX_PP-1748 REFLUX PUMP | B | 1 | 0 | 0.19 |
| PX_PP-531B ETHYLENE PUMP | B | 1 | 0 | 0.19 |
| PX_PP-669A SLOP OIL PUMP | B | 1 | 0 | 0.19 |
| PX_PP-1768C RICH AMINE PUMP | S | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Mar 2027 | PX_PP-807B | Pump overhaul | 0.72 |
| 02 Mar 2027 | PX_PP-339A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Sept 2026 | Medium | PX_PP-807B | Replace bearing PP-807B |
| 12 Sept 2026 | Medium | PX_PP-473A | Painting PP-473A |
| 02 Sept 2026 | Medium | PX_PP-1768C | Replace lamp as per PM finding |
| 22 Aug 2026 | Medium | PX_PP-958B | PP-958B discharge pressure low |
| 19 Jul 2026 | Low | PX_PP-339A | PP-339A seal leak |
| 27 May 2026 | Medium | PX_PP-339A | PP-339A seal leak |
| 04 Apr 2026 | Medium | PX_PP-339A | PP-339A seal leak |
| 07 Mar 2026 | Emergency | PX_PP-1225B | [MSI-B-26-WTG-155/M] Replace line |
| 12 Feb 2026 | Medium | PX_PP-473A | PP-473A abnormal noise |
| 09 Dec 2025 | Medium | PX_PP-1882C | [MSI-B-25-LFS-262/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Sept 2026 | 2 | 201000023539 | Corrective |
| 26 Feb 2026 | 1 | 201000019616 | Corrective |
| 22 Sept 2025 | 1 | 201000024779 | Corrective |