Sparely
DU

RING,WEAR,MODEL KD224,CS

Material 4100012394 · RING · Plant 1000

AReorderCriticalBelow reorder point
Material
4100012394
Category
RING
Base unit
EA
MRP type
Stock Item
Criticality
A (10 of 11 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 5.5 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
  • 2.Lead time ~92 days; expected demand during lead time 1.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 11 FuncLoc(s), 10 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 81.9M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
11
order qty 4
Service level
100.0%
stockout risk now 54%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 4 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 11 functional locations

10 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1882C
RECYCLE ETHANE PUMP
A120.62
PX_PP-807B
INHIBITOR PUMP
A121.05
PX_PP-339A
METHANE PUMP
B162.33
PX_PP-473A
CONDENSATE PUMP
B161.47
PX_PP-1225B
INHIBITOR PUMP
B120.62
PX_PP-958B
SEAL OIL PUMP
B120.62
PX_PP-1299
QUENCH OIL PUMP
B410.62
PX_PP-1748
REFLUX PUMP
B100.19
PX_PP-531B
ETHYLENE PUMP
B100.19
PX_PP-669A
SLOP OIL PUMP
B100.19
PX_PP-1768C
RICH AMINE PUMP
S120.62

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Mar 2027PX_PP-807BPump overhaul0.72
02 Mar 2027PX_PP-339APump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PP-807BReplace bearing PP-807B
12 Sept 2026MediumPX_PP-473APainting PP-473A
02 Sept 2026MediumPX_PP-1768CReplace lamp as per PM finding
22 Aug 2026MediumPX_PP-958BPP-958B discharge pressure low
19 Jul 2026LowPX_PP-339APP-339A seal leak
27 May 2026MediumPX_PP-339APP-339A seal leak
04 Apr 2026MediumPX_PP-339APP-339A seal leak
07 Mar 2026EmergencyPX_PP-1225B[MSI-B-26-WTG-155/M] Replace line
12 Feb 2026MediumPX_PP-473APP-473A abnormal noise
09 Dec 2025MediumPX_PP-1882C[MSI-B-25-LFS-262/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
27 Sept 20262201000023539Corrective
26 Feb 20261201000019616Corrective
22 Sept 20251201000024779Corrective