RING,WEAR,MODEL IE496,NBR

Material 4100012408 · RING · Plant 1000

AReduceNon-moving
Material
4100012408
Category
RING
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~92 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 46 exceeds the level to keep (2) by 44.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
46 / 0
no open PO
Today Min / Max
10 / 27
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 92.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 5 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1383
PROPYLENE PUMP
A100.19
PX_PP-912
BOTTOM PUMP
B120.62
PX_PP-413C
LEAN AMINE PUMP
B100.19
PX_PP-376A
QUENCH OIL PUMP
C110.62
PX_PP-953A
INHIBITOR PUMP
C100.19

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Feb 2027PX_PP-376APump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Jul 2026MediumPX_PP-912Replace bearing PP-912
24 Jun 2025LowPX_PP-376APP-376A seal leak
03 May 2025MediumPX_PP-912PP-912 abnormal noise

Recent goods issues

Never issued in the 17-month history.