RING,WEAR,MODEL TW907,SS316
Material 4100012477 · RING · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100012477
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- CAHAYA ELEKTRIK JAYA PT
- Lead time
- 82 d · P80 143 d
- Unit price
- Rp 2.9M
Recommendation
- 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~82 days; expected demand during lead time 0.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 5.8M · order by 01 Oct 2026
Expected arrival ≈ 82 days
Long-leadSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.9M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 142 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1396A CAUSTIC PUMP | A | 1 | 5 | 1.47 |
| PX_PP-604C BOTTOM PUMP | A | 1 | 0 | 0.19 |
| PX_PP-641A GASOLINE PUMP | A | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 82 ± 40 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Jun 2026 | PR06 Regular replenishment | 2 | Rp 3.0M | 19 Aug 2026 | 58 d |
| 04 Jun 2026 | PR05 Project / turnaround | 1 | Rp 2.8M | 19 Aug 2026 | 76 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Jul 2026 | Medium | PX_PP-1396A | Oil leak at PP-1396A bearing housing |
| 06 May 2026 | Medium | PX_PP-1396A | Leak from packing |
| 22 Oct 2025 | High | PX_PP-1396A | Install scaffolding at PP-1396A |
| 02 Sept 2025 | Medium | PX_PP-1396A | PP-1396A discharge pressure low |
| 10 May 2025 | High | PX_PP-1396A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 May 2026 | 2 | 201000018968 | Corrective |