Sparely
DU

RING,WEAR,MODEL TW907,SS316

Material 4100012477 · RING · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100012477
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
CAHAYA ELEKTRIK JAYA PT
Lead time
82 d · P80 143 d
Unit price
Rp 2.9M

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~82 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 5.8M · order by 01 Oct 2026
Expected arrival ≈ 82 days
Long-leadSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.9M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 142 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1396A
CAUSTIC PUMP
A151.47
PX_PP-604C
BOTTOM PUMP
A100.19
PX_PP-641A
GASOLINE PUMP
A100.19

Lead time and procurement

Lead time 82 ± 40 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
22 Jun 2026PR06
Regular replenishment
2Rp 3.0M19 Aug 202658 d
04 Jun 2026PR05
Project / turnaround
1Rp 2.8M19 Aug 202676 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Jul 2026MediumPX_PP-1396AOil leak at PP-1396A bearing housing
06 May 2026MediumPX_PP-1396ALeak from packing
22 Oct 2025HighPX_PP-1396AInstall scaffolding at PP-1396A
02 Sept 2025MediumPX_PP-1396APP-1396A discharge pressure low
10 May 2025HighPX_PP-1396ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
12 May 20262201000018968Corrective