RING,WEAR,MODEL YT668,SS304
Material 4100012495 · RING · Plant 1000
AReorderCriticalStockout
- Material
- 4100012495
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 92 d · P80 143 d
- Unit price
- Rp 8.2M (est.)
Recommendation
- 1.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~92 days; expected demand during lead time 0.3.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 49.1M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 16%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 463 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 862.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1735 SPENT CAUSTIC PUMP | A | 1 | 4 | 1.47 |
| PX_PP-1543 DILUTION STEAM PUMP | B | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Jan 2026 | Medium | PX_PP-1735 | Painting PP-1735 |
| 14 Nov 2025 | Medium | PX_PP-1543 | PP-1543 discharge pressure low |
| 11 Nov 2025 | Medium | PX_PP-1735 | Oil leak at PP-1735 bearing housing |
| 01 Nov 2025 | Medium | PX_PP-1735 | Replace bearing PP-1735 |
| 15 Jun 2025 | Medium | PX_PP-1735 | Oil leak at PP-1735 bearing housing |
| 31 May 2025 | Medium | PX_PP-1543 | PSM25/Overhaul PP-1543 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jun 2025 | 2 | 201000029625 | Corrective |