Sparely
DU

RING,WEAR,MODEL SW887,INCOLOY

Material 4100012709 · RING · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100012709
Category
RING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
93 d · P80 143 d
Unit price
Rp 16.8M

Recommendation

  • 1.Forecast 2.8 EA/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~93 days; expected demand during lead time 0.7.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 7 now.
  • 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 117.4M · order by 01 Oct 2026
Expected arrival ≈ 93 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
99.8%
stockout risk now 21%
Unit price
Rp 16.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 120 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-604C
BOTTOM PUMP
A100.19
PX_PP-467A
BFW PUMP
B171.90

Lead time and procurement

Lead time 93 ± 40 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
18 Mar 2026PR06
Regular replenishment
1Rp 16.8M20 Jun 202694 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Aug 2026MediumPX_PP-467AInstall scaffolding at PP-467A
23 May 2026MediumPX_PP-467ALeak from packing
21 Feb 2026LowPX_PP-467ALeak from packing
06 Nov 2025LowPX_PP-467ALeak from packing
28 Sept 2025MediumPX_PP-467AInstall scaffolding at PP-467A
14 Sept 2025MediumPX_PP-467APP-467A high vibration
17 May 2025LowPX_PP-467ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Jun 20263201000011358Corrective