RING,WEAR,MODEL SW887,INCOLOY
Material 4100012709 · RING · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100012709
- Category
- RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 93 d · P80 143 d
- Unit price
- Rp 16.8M
Recommendation
- 1.Forecast 2.8 EA/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~93 days; expected demand during lead time 0.7.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 7 now.
- 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 117.4M · order by 01 Oct 2026
Expected arrival ≈ 93 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
99.8%
stockout risk now 21%
Unit price
Rp 16.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 120 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-604C BOTTOM PUMP | A | 1 | 0 | 0.19 |
| PX_PP-467A BFW PUMP | B | 1 | 7 | 1.90 |
Lead time and procurement
Lead time 93 ± 40 days (PO history + category, 1 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Mar 2026 | PR06 Regular replenishment | 1 | Rp 16.8M | 20 Jun 2026 | 94 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Aug 2026 | Medium | PX_PP-467A | Install scaffolding at PP-467A |
| 23 May 2026 | Medium | PX_PP-467A | Leak from packing |
| 21 Feb 2026 | Low | PX_PP-467A | Leak from packing |
| 06 Nov 2025 | Low | PX_PP-467A | Leak from packing |
| 28 Sept 2025 | Medium | PX_PP-467A | Install scaffolding at PP-467A |
| 14 Sept 2025 | Medium | PX_PP-467A | PP-467A high vibration |
| 17 May 2025 | Low | PX_PP-467A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Jun 2026 | 3 | 201000011358 | Corrective |