RING,WEAR,SIZE RB901,VITON

Material 4100012908 · RING · Plant 1000

AReorderCriticalStockout
Material
4100012908
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~92 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 16.4M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 2%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 119.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-167
GASOLINE PUMP
A152.33

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Mar 2027PX_PP-167Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Jul 2026MediumPX_PP-167Replace bearing PP-167
04 Mar 2026MediumPX_PP-167Leak from packing
28 Dec 2025MediumPX_PP-167Replace lamp as per PM finding
04 Nov 2025LowPX_PP-167PP-167 abnormal noise
07 Jun 2025MediumPX_PP-167Replace bearing PP-167

Recent goods issues

Never issued in the 17-month history.