RING,WEAR,TYPE BD856,A182F11

Material 4100013013 · RING · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100013013
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
83 d · P80 143 d
Unit price
Rp 2.6M

Recommendation

  • 1.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~83 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 10.3M · order by 01 Oct 2026
Expected arrival ≈ 83 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 4%
Unit price
Rp 2.6M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 208 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 4 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-902B
BFW PUMP
A182.33
PX_PP-1899
ETHYLENE PUMP
B131.05
PX_PP-958B
SEAL OIL PUMP
B320.62
PX_PP-517A
CHARGE GAS PUMP
B100.19

Lead time and procurement

Lead time 83 ± 40 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
15 Oct 2025PR10
Other
1Rp 2.6M31 Dec 202577 d
18 Sept 2025PR03
Regular replenishment
1Rp 2.6M21 Nov 202564 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Sept 2026LowPX_PP-1899Painting PP-1899
22 Aug 2026MediumPX_PP-958BPP-958B discharge pressure low
18 Jul 2026LowPX_PP-902BReplace lamp as per PM finding
11 Apr 2026MediumPX_PP-1899PP-1899 discharge pressure low
02 Mar 2026MediumPX_PP-902BInstall scaffolding at PP-902B
26 Feb 2026MediumPX_PP-902BInstall cover plate for MCP cracking
26 Nov 2025HighPX_PP-902BPP-902B abnormal noise
15 Oct 2025MediumPX_PP-902BInstall scaffolding at PP-902B
22 Sept 2025HighPX_PP-902BRepair insulation PP-902B
04 Sept 2025MediumPX_PP-902B[MSI-B-25-WCE-184] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
07 Mar 20261201000002761Corrective