RING,WEAR,TYPE BD856,A182F11
Material 4100013013 · RING · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100013013
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 83 d · P80 143 d
- Unit price
- Rp 2.6M
Recommendation
- 1.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~83 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
- 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 10.3M · order by 01 Oct 2026
Expected arrival ≈ 83 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 4%
Unit price
Rp 2.6M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 208 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.
Installed on 4 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-902B BFW PUMP | A | 1 | 8 | 2.33 |
| PX_PP-1899 ETHYLENE PUMP | B | 1 | 3 | 1.05 |
| PX_PP-958B SEAL OIL PUMP | B | 3 | 2 | 0.62 |
| PX_PP-517A CHARGE GAS PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 83 ± 40 days (PO history + category, 2 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Oct 2025 | PR10 Other | 1 | Rp 2.6M | 31 Dec 2025 | 77 d |
| 18 Sept 2025 | PR03 Regular replenishment | 1 | Rp 2.6M | 21 Nov 2025 | 64 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Sept 2026 | Low | PX_PP-1899 | Painting PP-1899 |
| 22 Aug 2026 | Medium | PX_PP-958B | PP-958B discharge pressure low |
| 18 Jul 2026 | Low | PX_PP-902B | Replace lamp as per PM finding |
| 11 Apr 2026 | Medium | PX_PP-1899 | PP-1899 discharge pressure low |
| 02 Mar 2026 | Medium | PX_PP-902B | Install scaffolding at PP-902B |
| 26 Feb 2026 | Medium | PX_PP-902B | Install cover plate for MCP cracking |
| 26 Nov 2025 | High | PX_PP-902B | PP-902B abnormal noise |
| 15 Oct 2025 | Medium | PX_PP-902B | Install scaffolding at PP-902B |
| 22 Sept 2025 | High | PX_PP-902B | Repair insulation PP-902B |
| 04 Sept 2025 | Medium | PX_PP-902B | [MSI-B-25-WCE-184] Permanent repair |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Mar 2026 | 1 | 201000002761 | Corrective |