RING,WEAR,TYPE XV906,SS304
Material 4100013574 · RING · Plant 1000
AMonitorInsurance gap
- Material
- 4100013574
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 92 d · P80 143 d
- Unit price
- Rp 8.2M (est.)
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~92 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 4%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 185.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1776B RICH AMINE PUMP | A | 1 | 8 | 3.62 |
Lead time and procurement
Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Jul 2026 | Low | PX_PP-1776B | PP-1776B seal leak |
| 03 Jun 2026 | High | PX_PP-1776B | PP-1776B discharge pressure low |
| 03 Jan 2026 | Medium | PX_PP-1776B | PP-1776B discharge pressure low |
| 10 Nov 2025 | Medium | PX_PP-1776B | Leak from packing |
| 31 Oct 2025 | Low | PX_PP-1776B | PP-1776B seal leak |
| 13 Oct 2025 | Medium | PX_PP-1776B | [MSI-B-25-GDF-159] Permanent repair |
| 23 Sept 2025 | Low | PX_PP-1776B | Leak from packing |
| 11 Aug 2025 | High | PX_PP-1776B | Replace bearing PP-1776B |
Recent goods issues
Never issued in the 17-month history.