Sparely
DU

RING,WEAR,SIZE HO433,VITON

Material 4100013844 · RING · Plant 1000

AReduceNon-moving
Material
4100013844
Category
RING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 2.2 EA/year: 0.0 unplanned (installed-base failure prior (no history)) + 2.1 from the maintenance plan.
  • 2.Lead time ~92 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 4.
  • 4.Stock 6 exceeds the level to keep (4) by 2.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
4
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 53.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 1 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-957A
C3 RECYCLE PUMP
A331.05

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
09 Jan 2027PX_PP-957APump overhaul2.15

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Dec 2025MediumPX_PP-957APP-957A seal leak
04 Dec 2025MediumPX_PP-957AReplace bearing PP-957A
15 May 2025LowPX_PP-957APSM25/PP-957A abnormal noise

Recent goods issues

Never issued in the 17-month history.