GASKET,RING,1-1/2IN,300#,PTFE
Material 4100014000 · GASKET · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100014000
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (188 of 307 FuncLocs A/B, 33 safety/shutdown valve)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 35 d · P80 50 d
- Unit price
- Rp 36,085
Recommendation
- 1.Safety-critical element: installed on 33 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 533 EA/year: 529 unplanned (recency-weighted compound poisson (own history)) + 3.6 from the maintenance plan.
- 3.Lead time ~35 days; expected demand during lead time 52 (incl. 1.4 planned).
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 179, order up to 650.
- 5.Installed on 307 FuncLoc(s), 188 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 176Single sourceAbnormal consumptionOpen POPlanned demand in lead time
On hand / on order
483 / 452
next delivery 11 Oct 2026
Today Min / Max
113 / 329
static parameters in BoM
Rec. Min (reorder point)
179
safety stock 127
Rec. Max
650
order qty 471
Service level
99.9%
stockout risk now 0%
Unit price
Rp 36,085
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 56 issue days in the last 180 days, last issue 2 days ago, 150 failure notifications on its equipment in 90 days, 3 planned jobs in 90 days, 16 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (208 units) excluded from the baseline.
Demand pattern Smooth · 175 issue days · 14 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 37.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 307 functional locations
188 with criticality A/B · 374 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 1 | 73 | 27.01 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_KC-247A SLOP OIL FAN | A | 2 | 9 | 4.00 |
| PX_KC-717 FLUSHING OIL COMPRESSOR | A | 1 | 9 | 4.00 |
| PX_HE-1334B BOTTOM CONDENSER | A | 1 | 8 | 2.36 |
| PX_PP-1776B RICH AMINE PUMP | A | 1 | 8 | 3.62 |
| PX_HE-1635C CHARGE GAS COOLER | A | 1 | 7 | 1.93 |
| PX_KC-854C FEED FAN | A | 1 | 7 | 2.28 |
Lead time and procurement
Lead time 35 ± 25 days (PO history, 62 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Sept 2026 | PR03 Regular replenishment | 271 | Rp 37,264 | 31 Oct 2026 open | 51 d |
| 31 Aug 2026 | PR03 Regular replenishment | 314 | Rp 34,340 | 26 Sept 2026 | 26 d |
| 30 Aug 2026 | PR06 Regular replenishment | 371 | Rp 36,317 | 18 Sept 2026 | 19 d |
| 13 Aug 2026 | PR03 Regular replenishment | 160 | Rp 36,334 | 29 Sept 2026 | 47 d |
| 12 Aug 2026 | PR03 Regular replenishment | 229 | Rp 37,216 | 05 Sept 2026 | 24 d |
| 05 Aug 2026 | PR05 Project / turnaround | 259 | Rp 34,394 | 02 Sept 2026 | 28 d |
| 27 Jul 2026 | PR03 Regular replenishment | 136 | Rp 36,622 | 10 Sept 2026 | 45 d |
| 07 Jul 2026 | PR03 Regular replenishment | 453 | Rp 34,263 | 15 Aug 2026 | 39 d |
| 18 Jun 2026 | PR03 Regular replenishment | 366 | Rp 36,152 | 16 Jul 2026 | 28 d |
| 05 Jun 2026 | PR06 Regular replenishment | 372 | Rp 37,245 | 18 Jun 2026 | 13 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PY_PP-1584B | Pump overhaul | 0.72 |
| 01 Nov 2026 | PX_PCV-493 | Final Element Overhaul; Control Valve | 0.72 |
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
| 19 Feb 2027 | PX_PCV-1400B | Final Element Overhaul; Control Valve | 0.72 |
| 02 Jul 2027 | PX_PP-135A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 30 Sept 2026 | Medium | PX_PP-1864 | Install scaffolding at PP-1864 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 28 Sept 2026 | Medium | PX_PP-1938A | [MSI-B-26-ALF-384] Permanent repair |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 26 Sept 2026 | Low | PX_PP-1938A | Overhaul PP-1938A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Sept 2026 | 4 | 201000012583 | Corrective |
| 27 Sept 2026 | 2 | 201000005210 | Corrective |
| 26 Sept 2026 | 2 | 201000004515 | Corrective |
| 13 Sept 2026 | 5 | 201000035506 | Corrective |
| 11 Sept 2026 | 3 | 201000038057 | Corrective |
| 07 Sept 2026 | 3 | 201000030378 | Corrective |
| 07 Sept 2026 | 3 | 204000039956 | Preventive |
| 04 Sept 2026 | 4 | 201000014524 | Corrective |
| 31 Aug 2026 | 12 | 203000017844 | Turnaround |
| 25 Aug 2026 | 3 | 201000029784 | Corrective |
| 23 Aug 2026 | 4 | 201000000994 | Corrective |
| 10 Aug 2026 | 4 | 201000021114 | Corrective |
| 03 Aug 2026 | 3 | 201000035128 | Corrective |
| 31 Jul 2026 | 2 | 201000002390 | Corrective |
| 30 Jul 2026 | 5 | 201000038151 | Corrective |