GASKET,RING,8IN,600#,GRAPHITE
Material 4100014019 · GASKET · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100014019
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (92 of 152 FuncLocs A/B, 20 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 36 d · P80 52 d
- Unit price
- Rp 943,725
Recommendation
- 1.Safety-critical element: installed on 20 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 236 EA/year: 234 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
- 3.Lead time ~36 days; expected demand during lead time 24 (incl. 0.7 planned).
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 77, order up to 139.
- 5.Installed on 152 FuncLoc(s), 92 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 78Single sourceAbnormal consumptionOpen POPlanned demand in lead time
On hand / on order
3 / 473
next delivery 02 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
77
safety stock 54
Rec. Max
139
order qty 62
Service level
99.9%
stockout risk now 0%
Unit price
Rp 943,725
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 21 issue days in the last 180 days, last issue 1 days ago, 108 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 10 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (88 units) excluded from the baseline.
Demand pattern Smooth · 97 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 18.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 152 functional locations
92 with criticality A/B · 190 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1 | 23 | 9.01 |
| PX_KC-717 FLUSHING OIL COMPRESSOR | A | 1 | 9 | 4.00 |
| PX_PP-1776B RICH AMINE PUMP | A | 1 | 8 | 3.62 |
| PX_KC-854C FEED FAN | A | 1 | 7 | 2.28 |
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_PP-790A CHARGE GAS PUMP | A | 1 | 7 | 2.76 |
| PX_KC-226 HYDROGEN AIR COMPRESSOR | A | 1 | 6 | 2.28 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
Lead time and procurement
Lead time 36 ± 18 days (PO history, 29 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Sept 2026 | PR03 Regular replenishment | 244 | Rp 941,866 | 02 Oct 2026 open | 27 d |
| 12 Aug 2026 | PR05 Project / turnaround | 70 | Rp 953,488 | 30 Sept 2026 | 49 d |
| 01 Aug 2026 | PR04 Regular (other) | 229 | Rp 974,780 | 26 Oct 2026 open | 86 d |
| 22 Jul 2026 | PR01 Import / long-lead | 175 | Rp 957,064 | 12 Sept 2026 | 52 d |
| 19 Jul 2026 | PR06 Regular replenishment | 185 | Rp 939,747 | 09 Aug 2026 | 21 d |
| 16 Jul 2026 | PR03 Regular replenishment | 166 | Rp 919,620 | 07 Aug 2026 | 22 d |
| 12 Jul 2026 | PR03 Regular replenishment | 263 | Rp 938,547 | 15 Aug 2026 | 34 d |
| 24 Jun 2026 | PR04 Regular (other) | 113 | Rp 950,000 | 19 Jul 2026 | 25 d |
| 25 May 2026 | PR06 Regular replenishment | 80 | Rp 935,011 | 08 Jun 2026 | 14 d |
| 08 Apr 2026 | PR04 Regular (other) | 238 | Rp 953,515 | 01 May 2026 | 23 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PX_PCV-1543 | Final Element Overhaul; CV | 0.72 |
| 02 Feb 2027 | PX_PP-376A | Pump overhaul | 0.72 |
| 01 Mar 2027 | PX_PP-807B | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_PP-807B | Replace bearing PP-807B |
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 24 Sept 2026 | Emergency | PX_KC-538 | KC-538 high vibration |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 3 | 201000021867 | Corrective |
| 24 Sept 2026 | 1 | 201000009714 | Corrective |
| 17 Aug 2026 | 1 | 201000037592 | Corrective |
| 09 Aug 2026 | 1 | 201000006656 | Corrective |
| 10 Jul 2026 | 8 | 209000029244 | Other maintenance |
| 05 Jul 2026 | 8 | 209000017779 | Other maintenance |
| 04 Jul 2026 | 2 | 201000003202 | Corrective |
| 04 Jul 2026 | 1 | 201000013426 | Corrective |
| 30 Jun 2026 | 8 | 209000022177 | Other maintenance |
| 09 Jun 2026 | 2 | 201000027789 | Corrective |
| 07 Jun 2026 | 2 | 204000030837 | Preventive |
| 30 May 2026 | 2 | 201000020779 | Corrective |
| 19 May 2026 | 1 | 201000027299 | Corrective |
| 06 May 2026 | 7 | 201000011178 | Corrective |
| 06 May 2026 | 5 | 201000029629 | Corrective |