Sparely
DU

GASKET,RING,8IN,600#,GRAPHITE

Material 4100014019 · GASKET · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100014019
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (92 of 152 FuncLocs A/B, 20 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
36 d · P80 52 d
Unit price
Rp 943,725

Recommendation

  • 1.Safety-critical element: installed on 20 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 236 EA/year: 234 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
  • 3.Lead time ~36 days; expected demand during lead time 24 (incl. 0.7 planned).
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 77, order up to 139.
  • 5.Installed on 152 FuncLoc(s), 92 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 78Single sourceAbnormal consumptionOpen POPlanned demand in lead time
On hand / on order
3 / 473
next delivery 02 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
77
safety stock 54
Rec. Max
139
order qty 62
Service level
99.9%
stockout risk now 0%
Unit price
Rp 943,725
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 21 issue days in the last 180 days, last issue 1 days ago, 108 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 10 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (88 units) excluded from the baseline.

Demand pattern Smooth · 97 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 152 functional locations

92 with criticality A/B · 190 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_KC-717
FLUSHING OIL COMPRESSOR
A194.00
PX_PP-1776B
RICH AMINE PUMP
A183.62
PX_KC-854C
FEED FAN
A172.28
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_PP-790A
CHARGE GAS PUMP
A172.76
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28
PX_KT-419A
TURBINE FOR KC-419A
A162.81

Lead time and procurement

Lead time 36 ± 18 days (PO history, 29 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
05 Sept 2026PR03
Regular replenishment
244Rp 941,86602 Oct 2026
open
27 d
12 Aug 2026PR05
Project / turnaround
70Rp 953,48830 Sept 202649 d
01 Aug 2026PR04
Regular (other)
229Rp 974,78026 Oct 2026
open
86 d
22 Jul 2026PR01
Import / long-lead
175Rp 957,06412 Sept 202652 d
19 Jul 2026PR06
Regular replenishment
185Rp 939,74709 Aug 202621 d
16 Jul 2026PR03
Regular replenishment
166Rp 919,62007 Aug 202622 d
12 Jul 2026PR03
Regular replenishment
263Rp 938,54715 Aug 202634 d
24 Jun 2026PR04
Regular (other)
113Rp 950,00019 Jul 202625 d
25 May 2026PR06
Regular replenishment
80Rp 935,01108 Jun 202614 d
08 Apr 2026PR04
Regular (other)
238Rp 953,51501 May 202623 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_PCV-1543Final Element Overhaul; CV0.72
02 Feb 2027PX_PP-376APump overhaul0.72
01 Mar 2027PX_PP-807BPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_PP-807BReplace bearing PP-807B
26 Sept 2026MediumPX_KC-396Replace lamp as per PM finding
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20263201000021867Corrective
24 Sept 20261201000009714Corrective
17 Aug 20261201000037592Corrective
09 Aug 20261201000006656Corrective
10 Jul 20268209000029244Other maintenance
05 Jul 20268209000017779Other maintenance
04 Jul 20262201000003202Corrective
04 Jul 20261201000013426Corrective
30 Jun 20268209000022177Other maintenance
09 Jun 20262201000027789Corrective
07 Jun 20262204000030837Preventive
30 May 20262201000020779Corrective
19 May 20261201000027299Corrective
06 May 20267201000011178Corrective
06 May 20265201000029629Corrective