GASKET,RING,2IN,300#,PTFE

Material 4100014049 · GASKET · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100014049
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (68 of 113 FuncLocs A/B, 14 safety/shutdown valve)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
42 d · P80 56 d
Unit price
Rp 1.4M

Recommendation

  • 1.Safety-critical element: installed on 14 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 157 EA/year: 154 unplanned (recency-weighted compound poisson (own history)) + 2.9 from the maintenance plan.
  • 3.Lead time ~42 days; expected demand during lead time 19 (incl. 1.4 planned).
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 64, order up to 105.
  • 5.Installed on 113 FuncLoc(s), 68 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 34Single sourceAbnormal consumptionOpen POPlanned demand in lead time
On hand / on order
60 / 139
next delivery 04 Oct 2026
Today Min / Max
29 / 54
static parameters in BoM
Rec. Min (reorder point)
64
safety stock 45
Rec. Max
105
order qty 41
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.4M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 16 issue days in the last 180 days, last issue 1 days ago, 73 failure notifications on its equipment in 90 days, 3 planned jobs in 90 days, 9 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (50 units) excluded from the baseline.

Demand pattern Erratic · 68 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 113 functional locations

68 with criticality A/B · 134 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_HE-1334B
BOTTOM CONDENSER
A482.36
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-479C
DILUTION STEAM COMPRESSOR
A252.71
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_PP-139
CAUSTIC PUMP
A141.90
PX_SDV-676
CAUSTIC ISOLATION
A141.34
PX_CL-1839
COOLING WATER COLUMN
A131.23
PX_KC-671D
FEED BLOWER
A331.00
PX_FCV-610B
PP-251C OUTLET FLOW
A220.11

Lead time and procurement

Lead time 42 ± 24 days (PO history, 22 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
11 Aug 2026PR03
Regular replenishment
84Rp 1.4M24 Sept 202644 d
09 Aug 2026PR03
Regular replenishment
139Rp 1.5M04 Oct 2026
open
56 d
30 Jun 2026PR06
Regular replenishment
70Rp 1.5M18 Jul 202618 d
09 Jun 2026PR06
Regular replenishment
47Rp 1.4M13 Jul 202634 d
07 Jun 2026PR03
Regular replenishment
137Rp 1.5M16 Jul 202639 d
27 May 2026PR03
Regular replenishment
95Rp 1.5M26 Jun 202630 d
20 May 2026PR03
Regular replenishment
46Rp 1.4M08 Jun 202619 d
13 May 2026PR03
Regular replenishment
147Rp 1.4M06 Jul 202654 d
06 Apr 2026PR06
Regular replenishment
117Rp 1.4M02 May 202626 d
19 Mar 2026PR03
Regular replenishment
44Rp 1.4M24 Apr 202636 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_SDV-462Final Element Overhaul; ONOFFV0.72
01 Nov 2026PX_KC-235DCompressor major overhaul0.72
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
01 Mar 2027PX_PP-807BPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_PP-1892BReplace lamp as per PM finding
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_KC-575BInstall scaffolding at KC-575B
29 Sept 2026LowPX_SDV-1667Painting SDV-1667
27 Sept 2026MediumPX_PP-807BReplace bearing PP-807B
23 Sept 2026MediumPX_KC-513KC-513 high vibration
23 Sept 2026MediumPX_PP-1892BPP-1892B abnormal noise
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20262201000026532Corrective
06 Sept 20262203000008243Turnaround
05 Sept 20261201000005647Corrective
15 Aug 202613201000015659Corrective
11 Aug 20261201000022527Corrective
23 Jun 20262209000014083Other maintenance
19 Jun 20261201000024332Corrective
18 Jun 20266209000016742Other maintenance
15 Jun 20264201000020060Corrective
10 Jun 20263204000027901Preventive
08 Jun 20265201000027789Corrective
29 May 20265201000033112Corrective
28 Apr 20265201000020999Corrective
26 Apr 20266201000011532Corrective
21 Apr 20261201000018980Corrective