Sparely
DU

GASKET,SW,2IN,300#,GR/304

Material 4100014060 · GASKET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100014060
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (57 of 103 FuncLocs A/B, 6 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
35 d · P80 40 d
Unit price
Rp 1.0M

Recommendation

  • 1.Safety-critical element: installed on 6 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 115 EA/year: 112 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
  • 3.Lead time ~35 days; expected demand during lead time 11.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 42, order up to 83.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 83 now.
  • 6.Installed on 103 FuncLoc(s), 57 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
Proposed purchase requisition
83 EA
Rp 85.7M · order by 01 Oct 2026
Expected arrival ≈ 35 days
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 34Single sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
42
safety stock 32
Rec. Max
83
order qty 41
Service level
99.9%
stockout risk now 86%
Unit price
Rp 1.0M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 19 issue days in the last 180 days, last issue 1 days ago, 73 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (54 units) excluded from the baseline.

Demand pattern Smooth · 50 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 103 functional locations

57 with criticality A/B · 126 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A411442.86
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_BF-111
CRACKING FURNACE BF-111
A3239.01
PX_KC-854C
FEED FAN
A172.28
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-226
HYDROGEN AIR COMPRESSOR
A262.28
PX_KC-222B
LEAN AMINE COMPRESSOR
A151.85
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_HE-534C
SEAL OIL TLE
A130.65
PX_CL-859
FLUSHING OIL SCRUBBER
A120.81

Lead time and procurement

Lead time 35 ± 23 days (PO history, 21 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
06 Aug 2026PR01
Import / long-lead
99Rp 1.1M14 Sept 202639 d
22 Jul 2026PR06
Regular replenishment
79Rp 1.1M11 Aug 202620 d
30 Jun 2026PR05
Project / turnaround
97Rp 1.0M07 Sept 202669 d
14 Jun 2026PR03
Regular replenishment
44Rp 1.1M22 Jul 202638 d
26 Apr 2026PR05
Project / turnaround
44Rp 1.0M27 May 202631 d
08 Feb 2026PR06
Regular replenishment
32Rp 1.0M07 Mar 202627 d
03 Dec 2025PR06
Regular replenishment
83Rp 1.0M07 Jan 202635 d
26 Nov 2025PR01
Import / long-lead
82Rp 1.0M26 Jan 202661 d
10 Nov 2025PR06
Regular replenishment
78Rp 1.0M02 Dec 202522 d
11 Sept 2025PR03
Regular replenishment
83Rp 1.0M21 Sept 202510 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_PP-1952CPump overhaul0.72
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
01 Aug 2027PX_KC-620ACompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-287DPP-287D seal leak
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026LowPX_KC-879AInspect coupling KC-879A
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
23 Sept 2026LowPX_HE-1756BHE-1756B tube leak
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
22 Sept 2026MediumPX_KC-854COverhaul
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20262201000020309Corrective
30 Sept 20261201000022867Corrective
30 Sept 20261201000024363Corrective
08 Sept 20265204000028728Preventive
04 Sept 20261201000009852Corrective
28 Aug 20264203000017844Turnaround
25 Aug 20265201000024850Corrective
27 Jul 20261201000009720Corrective
23 Jul 20261201000023809Corrective
07 Jul 20265204000002628Preventive
05 Jul 20262201000018095Corrective
26 Jun 20261201000001753Corrective
24 Jun 20264201000001753Corrective
21 Jun 20266209000014083Other maintenance
17 Jun 20261201000006833Corrective