GASKET,SHEET,12IN,300#,GR/304

Material 4100014119 · GASKET · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100014119
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (39 of 69 FuncLocs A/B, 11 safety/shutdown valve)
Supplier
SURYA INSTRUMEN MAKMUR PT
Lead time
69 d · P80 89 d
Unit price
Rp 160,462

Recommendation

  • 1.Safety-critical element: installed on 11 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 100 EA/year: 97 unplanned (recency-weighted compound poisson (own history)) + 3.6 from the maintenance plan.
  • 3.Lead time ~69 days; expected demand during lead time 19 (incl. 0.7 planned).
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 68, order up to 165.
  • 5.Installed on 69 FuncLoc(s), 39 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 42Single sourceAbnormal consumptionOpen POPlanned demand in lead time
On hand / on order
49 / 201
next delivery 14 Nov 2026
Today Min / Max
15 / 34
static parameters in BoM
Rec. Min (reorder point)
68
safety stock 50
Rec. Max
165
order qty 97
Service level
99.9%
stockout risk now 0%
Unit price
Rp 160,462
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 13 issue days in the last 180 days, last issue 7 days ago, 65 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 7 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (50 units) excluded from the baseline.

Demand pattern Erratic · 34 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 69 functional locations

39 with criticality A/B · 86 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_HE-388A
CHARGE GAS EXCHANGER
A151.93
PX_KC-316D
METHANOL FAN
A151.43
PX_KT-397A
TURBINE FOR KC-397A
A252.81
PX_PP-1192
FEED PUMP
A151.47
PX_PP-1396A
CAUSTIC PUMP
A151.47
PX_TCV-515
TEMPERATURE CONTROL VALVE
A151.83
PX_HE-848C
COOLING WATER CONDENSER
A141.08
PX_KC-671D
FEED BLOWER
A131.00

Lead time and procurement

Lead time 69 ± 46 days (PO history, 21 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR03
Regular replenishment
63Rp 167,75626 Nov 2026
open
76 d
03 Sept 2026PR05
Project / turnaround
25Rp 155,30908 Feb 2027
open
158 d
01 Sept 2026PR03
Regular replenishment
41Rp 162,83114 Nov 2026
open
74 d
15 Aug 2026PR03
Regular replenishment
33Rp 155,00125 Sept 202641 d
02 Jul 2026PR03
Regular replenishment
33Rp 160,46219 Aug 202648 d
23 Jun 2026PR05
Project / turnaround
72Rp 157,53412 Jan 2027
open
203 d
18 Apr 2026PR03
Regular replenishment
31Rp 168,29028 May 202640 d
22 Mar 2026PR01
Import / long-lead
53Rp 156,94501 Jun 202671 d
24 Feb 2026PR03
Regular replenishment
73Rp 167,62703 Apr 202638 d
15 Feb 2026PR06
Regular replenishment
39Rp 166,74204 Apr 202648 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_SDV-1988Final Element Overhaul; ONOFFV0.72
02 May 2027PX_PP-1213Pump overhaul2.15
02 Jul 2027PX_PP-1498CPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
24 Sept 2026MediumPX_HE-388AReplace lamp as per PM finding
24 Sept 2026LowPX_HE-848CHE-848C fouling
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109

Recent goods issues

Posting dateQtyOrderOrder type
24 Sept 20261201000008685Corrective
23 Sept 20263201000030211Corrective
24 Aug 20261201000039454Corrective
09 Jul 20269201000014705Corrective
04 Jul 20264201000035815Corrective
30 Jun 20269201000006253Corrective
29 Jun 20262201000006253Corrective
29 Jun 20265201000006253Corrective
11 Jun 20264201000028320Corrective
10 Jun 20261201000031705Corrective
30 Apr 20262201000020375Corrective
20 Apr 20262201000029249Corrective
16 Apr 20261201000025702Corrective
13 Apr 20261201000013543Corrective
27 Mar 20261204000036669Preventive