Sparely
DU

GASKET,SHEET,6IN,300#,GRAPHITE

Material 4100014142 · GASKET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100014142
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (23 of 36 FuncLocs A/B, 5 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 5 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 67 EA/year: 67 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~31 days; expected demand during lead time 5.7.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 94.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 94 now.
  • 6.Installed on 36 FuncLoc(s), 23 of them criticality A/B.
  • 7.ML early warning: 85% probability of demand in the next 90 days.
Proposed purchase requisition
94 EA
Rp 20.2M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)ML early warningLast turnaround used 12Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
7 / 10
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 22
Rec. Max
94
order qty 67
Service level
100.0%
stockout risk now 73%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 85% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 42 days ago, 36 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Intermittent · 22 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 36 functional locations

23 with criticality A/B · 40 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_PP-1396A
CAUSTIC PUMP
A451.47
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_CL-159
C4 PRODUCT TOWER
A100.38
PX_HE-1596B
HYDROGEN TLE
A100.22
PX_HE-1744A
DILUTION STEAM COOLER
A100.22
PX_KC-155D
CAUSTIC BLOWER
A100.57
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PRV-271
SAFETY VALVE HE-606D
A100.04
PX_PRV-643
SAFETY VALVE HE-164A
A100.04
PX_VD-706A
QUENCH OIL SEPARATOR
A100.08

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
13 Sept 2026LowPX_KC-730Overhaul
06 Sept 2026MediumPX_BF-105Repair insulation BF-105

Recent goods issues

Posting dateQtyOrderOrder type
20 Aug 20264201000008952Corrective
17 Aug 20263201000027971Corrective
28 Jul 202611201000022042Corrective
14 Jul 20262201000028281Corrective
04 Jul 20266201000018095Corrective
17 Feb 20261201000026224Corrective
11 Feb 20269201000030684Corrective
19 Jan 20266201000030708Corrective
06 Jan 20265201000030617Corrective
25 Dec 20254201000034498Corrective
20 Nov 20252203000020131Turnaround
10 Nov 20254203000039046Turnaround
09 Nov 20251201000033816Corrective
05 Nov 20256203000029164Turnaround
04 Nov 20251201000030637Corrective