GASKET,SW,4IN,300#,GR/304
Material 4100014200 · GASKET · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100014200
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (17 of 29 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 29 d · P80 42 d
- Unit price
- Rp 34,229
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 48 EA/year: 47 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
- 3.Lead time ~29 days; expected demand during lead time 3.8.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 67.
- 5.Installed on 29 FuncLoc(s), 17 of them criticality A/B.
- 6.ML early warning: 89% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 2Single sourceAbnormal consumptionOpen PO
On hand / on order
12 / 42
next delivery 01 Nov 2026
Today Min / Max
4 / 12
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 15
Rec. Max
67
order qty 49
Service level
99.9%
stockout risk now 0%
Unit price
Rp 34,229
PO history
ML early warning: 89% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 23 days ago, 23 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (18 units) excluded from the baseline.
Demand pattern Lumpy · 19 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 29 functional locations
17 with criticality A/B · 40 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_HE-1913B SPENT CAUSTIC REBOILER | A | 1 | 4 | 1.50 |
| PX_PP-1161 LEAN AMINE PUMP | A | 1 | 4 | 1.47 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_CL-894 COOLING WATER COLUMN | A | 1 | 1 | 0.38 |
| PX_BF-101-COIL03 CONVECTION SECTION | A | 1 | 0 | 0.45 |
| PX_CL-789 SEAL OIL STRIPPER | A | 1 | 0 | 0.38 |
| PX_FCV-1224 BY PASS LINE | A | 1 | 0 | 0.11 |
| PX_FCV-1514A RECYCLE ETHANE FLOW CONTROL | A | 1 | 0 | 0.11 |
| PX_FCV-588 COOLING WATER FLOW CONTROL | A | 1 | 0 | 0.11 |
| PX_HE-1164D QUENCH WATER CONDENSER | B | 1 | 2 | 1.08 |
Lead time and procurement
Lead time 29 ± 17 days (PO history, 13 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Sept 2026 | PR03 Regular replenishment | 42 | Rp 34,933 | 01 Nov 2026 open | 54 d |
| 01 Aug 2026 | PR06 Regular replenishment | 31 | Rp 35,086 | 13 Aug 2026 | 12 d |
| 24 Jun 2026 | PR06 Regular replenishment | 14 | Rp 33,638 | 17 Jul 2026 | 23 d |
| 04 Mar 2026 | PR06 Regular replenishment | 11 | Rp 33,952 | 14 Mar 2026 | 10 d |
| 26 Nov 2025 | PR03 Regular replenishment | 21 | Rp 33,495 | 04 Jan 2026 | 39 d |
| 09 Nov 2025 | PR06 Regular replenishment | 34 | Rp 33,345 | 20 Nov 2025 | 11 d |
| 01 Nov 2025 | PR03 Regular replenishment | 41 | Rp 34,477 | 21 Nov 2025 | 20 d |
| 13 Oct 2025 | PR03 Regular replenishment | 28 | Rp 35,524 | 30 Oct 2025 | 17 d |
| 25 Aug 2025 | PR03 Regular replenishment | 36 | Rp 34,229 | 05 Oct 2025 | 41 d |
| 14 Aug 2025 | PR03 Regular replenishment | 28 | Rp 33,175 | 03 Sept 2025 | 20 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 09 Dec 2026 | PX_FCV-274A | Final Element Overhaul; Control Valve | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 13 Sept 2026 | High | PX_LCV-1691A | [MSI-B-26-KJJ-391/M] Replace line |
| 09 Sept 2026 | Medium | PX_HE-1913B | Replace lamp as per PM finding |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 30 Aug 2026 | High | PX_BF-102 | Painting BF-102 |
| 28 Aug 2026 | Medium | PX_FCV-274A | FCV-274A; IA leak from regulator |
| 27 Aug 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Sept 2026 | 2 | 201000034333 | Corrective |
| 29 Jun 2026 | 16 | 201000037337 | Corrective |
| 01 May 2026 | 2 | 201000003097 | Corrective |
| 24 Apr 2026 | 4 | 201000007375 | Corrective |
| 18 Apr 2026 | 3 | 201000020417 | Corrective |
| 31 Mar 2026 | 5 | 201000037731 | Corrective |
| 28 Mar 2026 | 1 | 201000032373 | Corrective |
| 12 Mar 2026 | 2 | 203000020244 | Turnaround |
| 23 Feb 2026 | 2 | 201000027766 | Corrective |
| 02 Jan 2026 | 1 | 201000003974 | Corrective |
| 05 Dec 2025 | 5 | 201000033460 | Corrective |
| 26 Nov 2025 | 2 | 203000012255 | Turnaround |
| 19 Nov 2025 | 6 | 201000038448 | Corrective |
| 11 Nov 2025 | 4 | 205000023084 | Other maintenance |
| 10 Nov 2025 | 1 | 205000023084 | Other maintenance |