GASKET,SW,4IN,300#,GR/304

Material 4100014200 · GASKET · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100014200
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (17 of 29 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
29 d · P80 42 d
Unit price
Rp 34,229

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 48 EA/year: 47 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
  • 3.Lead time ~29 days; expected demand during lead time 3.8.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 67.
  • 5.Installed on 29 FuncLoc(s), 17 of them criticality A/B.
  • 6.ML early warning: 89% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 2Single sourceAbnormal consumptionOpen PO
On hand / on order
12 / 42
next delivery 01 Nov 2026
Today Min / Max
4 / 12
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 15
Rec. Max
67
order qty 49
Service level
99.9%
stockout risk now 0%
Unit price
Rp 34,229
PO history
ML early warning: 89% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 23 days ago, 23 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (18 units) excluded from the baseline.

Demand pattern Lumpy · 19 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 29 functional locations

17 with criticality A/B · 40 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_HE-1913B
SPENT CAUSTIC REBOILER
A141.50
PX_PP-1161
LEAN AMINE PUMP
A141.47
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_CL-894
COOLING WATER COLUMN
A110.38
PX_BF-101-COIL03
CONVECTION SECTION
A100.45
PX_CL-789
SEAL OIL STRIPPER
A100.38
PX_FCV-1224
BY PASS LINE
A100.11
PX_FCV-1514A
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_FCV-588
COOLING WATER FLOW CONTROL
A100.11
PX_HE-1164D
QUENCH WATER CONDENSER
B121.08

Lead time and procurement

Lead time 29 ± 17 days (PO history, 13 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
08 Sept 2026PR03
Regular replenishment
42Rp 34,93301 Nov 2026
open
54 d
01 Aug 2026PR06
Regular replenishment
31Rp 35,08613 Aug 202612 d
24 Jun 2026PR06
Regular replenishment
14Rp 33,63817 Jul 202623 d
04 Mar 2026PR06
Regular replenishment
11Rp 33,95214 Mar 202610 d
26 Nov 2025PR03
Regular replenishment
21Rp 33,49504 Jan 202639 d
09 Nov 2025PR06
Regular replenishment
34Rp 33,34520 Nov 202511 d
01 Nov 2025PR03
Regular replenishment
41Rp 34,47721 Nov 202520 d
13 Oct 2025PR03
Regular replenishment
28Rp 35,52430 Oct 202517 d
25 Aug 2025PR03
Regular replenishment
36Rp 34,22905 Oct 202541 d
14 Aug 2025PR03
Regular replenishment
28Rp 33,17503 Sept 202520 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
09 Dec 2026PX_FCV-274AFinal Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
13 Sept 2026HighPX_LCV-1691A[MSI-B-26-KJJ-391/M] Replace line
09 Sept 2026MediumPX_HE-1913BReplace lamp as per PM finding
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
28 Aug 2026MediumPX_FCV-274AFCV-274A; IA leak from regulator
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102

Recent goods issues

Posting dateQtyOrderOrder type
08 Sept 20262201000034333Corrective
29 Jun 202616201000037337Corrective
01 May 20262201000003097Corrective
24 Apr 20264201000007375Corrective
18 Apr 20263201000020417Corrective
31 Mar 20265201000037731Corrective
28 Mar 20261201000032373Corrective
12 Mar 20262203000020244Turnaround
23 Feb 20262201000027766Corrective
02 Jan 20261201000003974Corrective
05 Dec 20255201000033460Corrective
26 Nov 20252203000012255Turnaround
19 Nov 20256201000038448Corrective
11 Nov 20254205000023084Other maintenance
10 Nov 20251205000023084Other maintenance