Sparely
DU

GASKET,SW,8IN,600#,GRAPHITE

Material 4100014225 · GASKET · Plant 1000

ASafety-criticalReduceExcess
Material
4100014225
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (13 of 26 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
37 d · P80 50 d
Unit price
Rp 31,940

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 65 EA/year: 65 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~37 days; expected demand during lead time 6.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 28, order up to 93.
  • 5.Stock 99 exceeds the level to keep (93) by 6.
  • 6.Installed on 26 FuncLoc(s), 13 of them criticality A/B.
  • 7.ML early warning: 98% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 12Single sourceAbnormal consumptionOpen PO
On hand / on order
99 / 18
next delivery 12 Oct 2026
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
28
safety stock 22
Rec. Max
93
order qty 65
Service level
100.0%
stockout risk now 0%
Unit price
Rp 31,940
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 8 days ago, 45 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Intermittent · 21 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 26 functional locations

13 with criticality A/B · 33 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_KC-713B
SPENT CAUSTIC FAN
A263.14
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_3/4-P-10242-A51A-T
PIPE-3/4 FROM PP-1407B TO BF-104
A100.01
PX_CL-789
SEAL OIL STRIPPER
A100.38
PX_PRV-708C
SAFETY VALVE HE-179D
A100.04
PX_VD-1637
ETHYLENE KO DRUM
A100.08
PX_KC-624A
RECYCLE ETHANE BLOWER
B152.28
PX_VD-1990B
SEAL OIL SURGE DRUM
B120.93
PX_VD-103
C3 RECYCLE SEPARATOR
B110.08
PX_HE-526A
COOLING WATER REBOILER
B100.22

Lead time and procurement

Lead time 37 ± 15 days (PO history, 12 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
06 Aug 2026PR03
Regular replenishment
18Rp 32,06312 Oct 2026
open
67 d
21 Jul 2026PR06
Regular replenishment
13Rp 31,51022 Aug 202632 d
17 Jul 2026PR03
Regular replenishment
17Rp 33,48418 Aug 202632 d
07 Jun 2026PR06
Regular replenishment
30Rp 33,46629 Jul 202652 d
12 May 2026PR03
Regular replenishment
12Rp 31,04604 Jun 202623 d
22 Feb 2026PR06
Regular replenishment
45Rp 32,11004 Apr 202641 d
25 Dec 2025PR06
Regular replenishment
25Rp 31,51518 Feb 202655 d
17 Oct 2025PR06
Regular replenishment
15Rp 32,70707 Nov 202521 d
12 Sept 2025PR03
Regular replenishment
44Rp 31,22008 Oct 202526 d
11 Jul 2025PR06
Regular replenishment
22Rp 32,99511 Aug 202531 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
21 Sept 2026MediumPX_KC-843Painting KC-843
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
17 Sept 2026LowPX_FCV-651Overhaul FCV-651

Recent goods issues

Posting dateQtyOrderOrder type
23 Sept 20261201000037585Corrective
22 Sept 20263201000010227Corrective
05 Sept 202616201000005647Corrective
22 Jul 20262201000021281Corrective
08 Jul 20262201000003402Corrective
21 Jun 20267201000023783Corrective
05 Jun 20265201000009741Corrective
13 May 20268201000038242Corrective
26 Jan 20268201000010949Corrective
20 Jan 20261201000029129Corrective
04 Jan 20263201000034723Corrective
25 Dec 20254201000034498Corrective
23 Dec 20252203000001878Turnaround
19 Dec 20254203000033370Turnaround
05 Dec 20252201000007427Corrective