GASKET,SHEET,1/2IN,300#,GR/304

Material 4100014238 · GASKET · Plant 1000

ASafety-criticalReorderCriticalBelow reorder point
Material
4100014238
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (17 of 25 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
MEGA TEKNOLOGI SENTOSA PT
Lead time
39 d · P80 54 d
Unit price
Rp 71,542

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 27 EA/year: 27 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
  • 3.Lead time ~39 days; expected demand during lead time 2.8.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 45.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 43 now.
  • 6.Installed on 25 FuncLoc(s), 17 of them criticality A/B.
  • 7.ML early warning: 82% probability of demand in the next 90 days.
Proposed purchase requisition
43 EA
Rp 3.1M · order by 01 Oct 2026
Expected arrival ≈ 39 days
Safety-critical (SCE)ML early warningLast turnaround used 6Single sourceAbnormal consumption
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 15
Rec. Max
45
order qty 28
Service level
100.0%
stockout risk now 58%
Unit price
Rp 71,542
PO history
ML early warning: 82% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 10 days ago, 11 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (18 units) excluded from the baseline.

Demand pattern Lumpy · 14 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 25 functional locations

17 with criticality A/B · 41 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_KC-867D
CONDENSATE FAN
A162.71
PX_HE-1913B
SPENT CAUSTIC REBOILER
A141.50
PX_VD-1618
METHANE SURGE DRUM
A140.93
PX_HE-241
C3 RECYCLE COOLER
A220.65
PX_KT-460B
TURBINE FOR KC-460B
A221.96
PX_VD-1729
PROPYLENE KO DRUM
A120.08
PX_BF-109-COIL07
QO TO QUENCH FITTING
A100.45
PX_FCV-1326
BY PASS LINE
A100.11
PX_FCV-1775
VD-1597B OUTLET FLOW
A400.11
PX_HE-1934D
ETHYLENE COOLER
A100.22
PX_KT-308B
TURBINE FOR KC-308B
A401.10

Lead time and procurement

Lead time 39 ± 18 days (PO history, 10 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
14 Aug 2026PR03
Regular replenishment
30Rp 74,21624 Sept 202641 d
24 May 2026PR03
Regular replenishment
14Rp 69,79630 Jul 202667 d
11 May 2026PR03
Regular replenishment
36Rp 70,46129 May 202618 d
09 Apr 2026PR06
Regular replenishment
18Rp 75,69115 May 202636 d
09 Apr 2026PR06
Regular replenishment
28Rp 72,86111 May 202632 d
01 Feb 2026PR06
Regular replenishment
14Rp 70,19727 Feb 202626 d
24 Sept 2025PR03
Regular replenishment
39Rp 69,60514 Nov 202551 d
09 Sept 2025PR03
Regular replenishment
21Rp 72,62307 Oct 202528 d
18 Jul 2025PR05
Project / turnaround
26Rp 70,09703 Oct 202577 d
09 Jul 2025PR03
Regular replenishment
31Rp 73,68312 Aug 202534 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_LCV-1246Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
17 Sept 2026MediumPX_KC-867DLeak from packing
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
09 Sept 2026MediumPX_HE-1913BReplace lamp as per PM finding
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
17 Aug 2026MediumPX_LCV-915Overhaul LCV-915
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
15 Aug 2026LowPX_VD-1618Painting VD-1618
18 Jul 2026LowPX_HE-241Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20261201000039118Corrective
08 Apr 20262201000006132Corrective
01 Jan 20261201000012015Corrective
31 Dec 20253201000019150Corrective
22 Dec 20252201000003905Corrective
14 Dec 20252201000003658Corrective
07 Dec 20251201000002161Corrective
07 Dec 20252201000021229Corrective
30 Nov 20254203000012255Turnaround
09 Nov 20251201000033816Corrective
09 Nov 20252203000033996Turnaround
06 Nov 20256201000037158Corrective
31 Oct 20256209000022917Other maintenance
22 Oct 20251204000032679Preventive
13 Oct 202512203000009203Turnaround