GASKET,SHEET,1/2IN,300#,GR/304
Material 4100014238 · GASKET · Plant 1000
ASafety-criticalReorderCriticalBelow reorder point
- Material
- 4100014238
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (17 of 25 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- MEGA TEKNOLOGI SENTOSA PT
- Lead time
- 39 d · P80 54 d
- Unit price
- Rp 71,542
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 27 EA/year: 27 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
- 3.Lead time ~39 days; expected demand during lead time 2.8.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 45.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 43 now.
- 6.Installed on 25 FuncLoc(s), 17 of them criticality A/B.
- 7.ML early warning: 82% probability of demand in the next 90 days.
Proposed purchase requisition
43 EA
Rp 3.1M · order by 01 Oct 2026
Expected arrival ≈ 39 days
Safety-critical (SCE)ML early warningLast turnaround used 6Single sourceAbnormal consumption
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 15
Rec. Max
45
order qty 28
Service level
100.0%
stockout risk now 58%
Unit price
Rp 71,542
PO history
ML early warning: 82% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 10 days ago, 11 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 5 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (18 units) excluded from the baseline.
Demand pattern Lumpy · 14 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 25 functional locations
17 with criticality A/B · 41 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_KC-867D CONDENSATE FAN | A | 1 | 6 | 2.71 |
| PX_HE-1913B SPENT CAUSTIC REBOILER | A | 1 | 4 | 1.50 |
| PX_VD-1618 METHANE SURGE DRUM | A | 1 | 4 | 0.93 |
| PX_HE-241 C3 RECYCLE COOLER | A | 2 | 2 | 0.65 |
| PX_KT-460B TURBINE FOR KC-460B | A | 2 | 2 | 1.96 |
| PX_VD-1729 PROPYLENE KO DRUM | A | 1 | 2 | 0.08 |
| PX_BF-109-COIL07 QO TO QUENCH FITTING | A | 1 | 0 | 0.45 |
| PX_FCV-1326 BY PASS LINE | A | 1 | 0 | 0.11 |
| PX_FCV-1775 VD-1597B OUTLET FLOW | A | 4 | 0 | 0.11 |
| PX_HE-1934D ETHYLENE COOLER | A | 1 | 0 | 0.22 |
| PX_KT-308B TURBINE FOR KC-308B | A | 4 | 0 | 1.10 |
Lead time and procurement
Lead time 39 ± 18 days (PO history, 10 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Aug 2026 | PR03 Regular replenishment | 30 | Rp 74,216 | 24 Sept 2026 | 41 d |
| 24 May 2026 | PR03 Regular replenishment | 14 | Rp 69,796 | 30 Jul 2026 | 67 d |
| 11 May 2026 | PR03 Regular replenishment | 36 | Rp 70,461 | 29 May 2026 | 18 d |
| 09 Apr 2026 | PR06 Regular replenishment | 18 | Rp 75,691 | 15 May 2026 | 36 d |
| 09 Apr 2026 | PR06 Regular replenishment | 28 | Rp 72,861 | 11 May 2026 | 32 d |
| 01 Feb 2026 | PR06 Regular replenishment | 14 | Rp 70,197 | 27 Feb 2026 | 26 d |
| 24 Sept 2025 | PR03 Regular replenishment | 39 | Rp 69,605 | 14 Nov 2025 | 51 d |
| 09 Sept 2025 | PR03 Regular replenishment | 21 | Rp 72,623 | 07 Oct 2025 | 28 d |
| 18 Jul 2025 | PR05 Project / turnaround | 26 | Rp 70,097 | 03 Oct 2025 | 77 d |
| 09 Jul 2025 | PR03 Regular replenishment | 31 | Rp 73,683 | 12 Aug 2025 | 34 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_LCV-1246 | Final Element Overhaul; Control Valve | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 17 Sept 2026 | Medium | PX_KC-867D | Leak from packing |
| 13 Sept 2026 | Medium | PX_BF-109 | Install scaffolding at BF-109 |
| 09 Sept 2026 | Medium | PX_HE-1913B | Replace lamp as per PM finding |
| 03 Sept 2026 | Low | PX_BF-109 | Install scaffolding at BF-109 |
| 02 Sept 2026 | Low | PX_BF-109 | Install cover plate for MCP cracking |
| 17 Aug 2026 | Medium | PX_LCV-915 | Overhaul LCV-915 |
| 16 Aug 2026 | Medium | PX_BF-109 | Install cover plate BF-109 |
| 15 Aug 2026 | Low | PX_VD-1618 | Painting VD-1618 |
| 18 Jul 2026 | Low | PX_HE-241 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Sept 2026 | 1 | 201000039118 | Corrective |
| 08 Apr 2026 | 2 | 201000006132 | Corrective |
| 01 Jan 2026 | 1 | 201000012015 | Corrective |
| 31 Dec 2025 | 3 | 201000019150 | Corrective |
| 22 Dec 2025 | 2 | 201000003905 | Corrective |
| 14 Dec 2025 | 2 | 201000003658 | Corrective |
| 07 Dec 2025 | 1 | 201000002161 | Corrective |
| 07 Dec 2025 | 2 | 201000021229 | Corrective |
| 30 Nov 2025 | 4 | 203000012255 | Turnaround |
| 09 Nov 2025 | 1 | 201000033816 | Corrective |
| 09 Nov 2025 | 2 | 203000033996 | Turnaround |
| 06 Nov 2025 | 6 | 201000037158 | Corrective |
| 31 Oct 2025 | 6 | 209000022917 | Other maintenance |
| 22 Oct 2025 | 1 | 204000032679 | Preventive |
| 13 Oct 2025 | 12 | 203000009203 | Turnaround |