GASKET,RING,1IN,300#,PTFE
Material 4100014252 · GASKET · Plant 1000
ASafety-criticalReduceExcess
- Material
- 4100014252
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (17 of 27 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 32 d · P80 39 d
- Unit price
- Rp 126,802
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 23 EA/year: 23 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~32 days; expected demand during lead time 2.0.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 35.
- 5.Stock 41 exceeds the level to keep (35) by 6.
- 6.Installed on 27 FuncLoc(s), 17 of them criticality A/B.
- 7.ML early warning: 88% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 32Single source
On hand / on order
41 / 0
no open PO
Today Min / Max
9 / 18
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 10
Rec. Max
35
order qty 23
Service level
100.0%
stockout risk now 0%
Unit price
Rp 126,802
PO history
ML early warning: 88% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 48 days ago, 30 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (32 units) excluded from the baseline.
Demand pattern Lumpy · 11 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 27 functional locations
17 with criticality A/B · 31 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_HE-1483A C4 PRODUCT COOLER | A | 1 | 11 | 3.22 |
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-222B LEAN AMINE COMPRESSOR | A | 1 | 5 | 1.85 |
| PX_KC-316D METHANOL FAN | A | 1 | 5 | 1.43 |
| PX_PP-1022 QUENCH WATER PUMP | A | 1 | 3 | 1.47 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_PCV-1709B BY PASS DUCT | A | 1 | 1 | 0.08 |
| PX_HE-606D DEMIN WATER COOLER | A | 1 | 0 | 0.22 |
| PX_MOV-1524 MOTOR OPERATED GATE VALVE | A | 1 | 0 | 0.06 |
| PX_PP-641A GASOLINE PUMP | A | 1 | 0 | 0.19 |
| PX_HE-786 ETHYLENE COOLER | B | 1 | 4 | 1.08 |
Lead time and procurement
Lead time 32 ± 12 days (PO history, 12 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Aug 2026 | PR03 Regular replenishment | 28 | Rp 122,600 | 25 Aug 2026 | 23 d |
| 20 Apr 2026 | PR03 Regular replenishment | 17 | Rp 128,395 | 19 May 2026 | 29 d |
| 02 Mar 2026 | PR06 Regular replenishment | 23 | Rp 129,539 | 26 Mar 2026 | 24 d |
| 29 Jan 2026 | PR03 Regular replenishment | 9 | Rp 123,533 | 15 Feb 2026 | 17 d |
| 27 Jan 2026 | PR05 Project / turnaround | 21 | Rp 130,459 | 27 Mar 2026 | 59 d |
| 11 Jan 2026 | PR03 Regular replenishment | 16 | Rp 121,215 | 17 Feb 2026 | 37 d |
| 22 Oct 2025 | PR03 Regular replenishment | 28 | Rp 121,753 | 01 Dec 2025 | 40 d |
| 20 Sept 2025 | PR03 Regular replenishment | 28 | Rp 125,208 | 19 Oct 2025 | 29 d |
| 30 Aug 2025 | PR03 Regular replenishment | 23 | Rp 119,581 | 09 Oct 2025 | 40 d |
| 29 Aug 2025 | PR03 Regular replenishment | 12 | Rp 129,600 | 04 Oct 2025 | 36 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 23 Sept 2026 | Medium | PX_HE-1483A | HE-1483A fouling |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 16 Sept 2026 | Medium | PX_HE-786 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Aug 2026 | 1 | 201000011746 | Corrective |
| 15 Jul 2026 | 1 | 201000026330 | Corrective |
| 10 May 2026 | 2 | 204000019410 | Preventive |
| 25 Feb 2026 | 5 | 204000028926 | Preventive |
| 20 Jan 2026 | 1 | 201000015985 | Corrective |
| 28 Dec 2025 | 14 | 203000006078 | Turnaround |
| 20 Dec 2025 | 2 | 201000033420 | Corrective |
| 18 Dec 2025 | 1 | 201000008954 | Corrective |
| 05 Dec 2025 | 5 | 201000018271 | Corrective |
| 28 Nov 2025 | 4 | 203000009623 | Turnaround |
| 07 Nov 2025 | 2 | 203000033996 | Turnaround |
| 01 Nov 2025 | 12 | 203000039255 | Turnaround |
| 28 Aug 2025 | 2 | 209000035104 | Other maintenance |
| 29 May 2025 | 1 | 201000027735 | Corrective |
| 19 May 2025 | 5 | 201000014175 | Corrective |