GASKET,RING,4IN,300#,GR/304
Material 4100014324 · GASKET · Plant 1000
ASafety-criticalMonitorStockout
- Material
- 4100014324
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (13 of 18 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 39 d · P80 50 d
- Unit price
- Rp 1.6M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 32 EA/year: 31 unplanned (recency-weighted compound poisson (own history)) + 1.4 from the maintenance plan.
- 3.Lead time ~39 days; expected demand during lead time 3.2.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 35.
- 5.Installed on 18 FuncLoc(s), 13 of them criticality A/B.
- 6.ML early warning: 86% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 2Single sourceOpen PO
On hand / on order
0 / 21
next delivery 08 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 14
Rec. Max
35
order qty 18
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.6M
PO history
ML early warning: 86% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 7 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 12 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 18 functional locations
13 with criticality A/B · 21 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_CL-457 FEED SCRUBBER | A | 1 | 11 | 3.80 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_FCV-1644 VD-981A OUTLET FLOW | A | 1 | 2 | 0.11 |
| PX_KC-588 CAUSTIC FAN | A | 1 | 2 | 1.00 |
| PX_PRV-929A SAFETY VALVE PP-1076A | A | 1 | 1 | 0.04 |
| PX_KC-618B WASH WATER BLOWER | A | 1 | 0 | 0.57 |
| PX_LCV-150 HE-492C LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_PCV-1400B PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| UT_VD-1010A REFLUX KO DRUM | A | 1 | 0 | 0.08 |
| PX_KC-620A DEMIN WATER AIR COMPRESSOR | B | 1 | 2 | 1.00 |
| PX_BF-101-QF17 DILUTION STEAM TO MIXED FEED COIL | B | 1 | 0 | 0.45 |
Lead time and procurement
Lead time 39 ± 28 days (PO history, 9 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Sept 2026 | PR06 Regular replenishment | 12 | Rp 1.6M | 08 Oct 2026 open | 20 d |
| 21 Jul 2026 | PR04 Regular (other) | 9 | Rp 1.6M | 16 Nov 2026 open | 118 d |
| 02 Jul 2026 | PR03 Regular replenishment | 9 | Rp 1.6M | 07 Aug 2026 | 36 d |
| 22 Jun 2026 | PR06 Regular replenishment | 14 | Rp 1.7M | 06 Jul 2026 | 14 d |
| 30 May 2026 | PR06 Regular replenishment | 21 | Rp 1.6M | 26 Jun 2026 | 27 d |
| 19 Dec 2025 | PR06 Regular replenishment | 11 | Rp 1.6M | 18 Jan 2026 | 30 d |
| 21 Nov 2025 | PR06 Regular replenishment | 7 | Rp 1.7M | 24 Jan 2026 | 64 d |
| 20 Nov 2025 | PR05 Project / turnaround | 7 | Rp 1.7M | 12 Dec 2025 | 22 d |
| 09 Oct 2025 | PR04 Regular (other) | 16 | Rp 1.6M | 18 Nov 2025 | 40 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 19 Feb 2027 | PX_PCV-1400B | Final Element Overhaul; Control Valve | 0.72 |
| 01 Aug 2027 | PX_KC-620A | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 15 Sept 2026 | Medium | PX_CL-457 | CL-457 DP high |
| 13 Sept 2026 | Medium | PX_BF-109 | Install scaffolding at BF-109 |
| 03 Sept 2026 | Low | PX_BF-109 | Install scaffolding at BF-109 |
| 02 Sept 2026 | Low | PX_BF-109 | Install cover plate for MCP cracking |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 21 Aug 2026 | Medium | PX_CL-457 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Sept 2026 | 1 | 201000009714 | Corrective |
| 22 Sept 2026 | 3 | 201000009714 | Corrective |
| 06 Sept 2026 | 1 | 201000004876 | Corrective |
| 15 Jul 2026 | 1 | 201000025691 | Corrective |
| 23 Dec 2025 | 2 | 203000033370 | Turnaround |
| 17 Dec 2025 | 2 | 209000020420 | Other maintenance |
| 20 Nov 2025 | 3 | 201000030034 | Corrective |
| 16 Nov 2025 | 1 | 201000017157 | Corrective |
| 29 Sept 2025 | 8 | 201000025755 | Corrective |
| 16 Aug 2025 | 4 | 201000027093 | Corrective |
| 09 Aug 2025 | 1 | 201000014472 | Corrective |
| 03 Aug 2025 | 3 | 204000037748 | Preventive |
| 05 Jul 2025 | 6 | 209000007603 | Other maintenance |
| 04 Jun 2025 | 8 | 201000025970 | Corrective |