GASKET,RING,8IN,300#,GRAPHITE

Material 4100014337 · GASKET · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100014337
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (10 of 17 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
28 d · P80 34 d
Unit price
Rp 1.2M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 44 EA/year: 43 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
  • 3.Lead time ~28 days; expected demand during lead time 3.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 42.
  • 5.Installed on 17 FuncLoc(s), 10 of them criticality A/B.
  • 6.ML early warning: 76% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 2Single sourceAbnormal consumptionOpen PO
On hand / on order
30 / 21
next delivery 04 Oct 2026
Today Min / Max
11 / 23
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 15
Rec. Max
42
order qty 24
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.2M
PO history
ML early warning: 76% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 22 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Lumpy · 10 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 17 functional locations

10 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_HE-1393C
QUENCH WATER PREHEATER
A131.08
PX_KC-464A
CONDENSATE BLOWER
A121.43
PX_SDV-554B
CHARGE GAS ISOLATION
A110.06
PY_VD-953B
METHANOL DRUM
A110.51
PX_PP-1325
BFW PUMP
B151.90
PX_HE-695A
METHANOL TLE
B421.08
PX_PP-657C
SEAL OIL PUMP
B100.19
PX_HE-1727
LUBE OIL COOLER
C131.08
PX_HE-1715D
DILUTION STEAM REBOILER
C100.22

Lead time and procurement

Lead time 28 ± 12 days (PO history, 6 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
05 Sept 2026PR03
Regular replenishment
21Rp 1.1M04 Oct 2026
open
29 d
30 Jul 2026PR06
Regular replenishment
20Rp 1.1M10 Aug 202611 d
03 May 2026PR06
Regular replenishment
25Rp 1.2M28 May 202625 d
18 Jul 2025PR03
Regular replenishment
7Rp 1.1M21 Aug 202534 d
03 Jul 2025PR03
Regular replenishment
16Rp 1.2M10 Aug 202538 d
22 May 2025PR03
Regular replenishment
22Rp 1.2M12 Jun 202521 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
07 Jul 2027PX_KC-505DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
10 Sept 2026MediumPX_KC-479CKC-479C bearing temp high
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102
26 Aug 2026MediumPX_HE-1393CHE-1393C tube leak
23 Aug 2026HighPX_HE-1393CReplace lamp as per PM finding
18 Aug 2026LowPX_KC-479CLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
09 Sept 20263201000021806Corrective
03 Aug 20261201000029979Corrective
26 Jul 20262201000003691Corrective
14 Feb 20267201000013371Corrective
10 Jan 20263201000015307Corrective
09 Jan 20262201000028812Corrective
31 Dec 20254201000028354Corrective
15 Dec 20252201000009093Corrective
15 Dec 20255201000029708Corrective
06 Dec 20254201000033371Corrective
07 Nov 20252203000026396Turnaround
20 May 202513201000023546Corrective