GASKET,SHEET,1/4IN,600#,PTFE
Material 4100014371 · GASKET · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100014371
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (12 of 27 FuncLocs A/B, 4 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 14 EA/year: 14 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~31 days; expected demand during lead time 1.2.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 25.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 25 now.
- 6.Installed on 27 FuncLoc(s), 12 of them criticality A/B.
- 7.ML early warning: 65% probability of demand in the next 90 days.
Proposed purchase requisition
25 EA
Rp 5.4M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)ML early warningAbnormal consumptionPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
15 / 22
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 9
Rec. Max
25
order qty 15
Service level
100.0%
stockout risk now 38%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 65% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 86 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 27 functional locations
12 with criticality A/B · 30 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-247A SLOP OIL FAN | A | 1 | 9 | 4.00 |
| PX_PRV-769B SAFETY VALVE PP-1619A | A | 1 | 1 | 0.04 |
| PX_FCV-588 COOLING WATER FLOW CONTROL | A | 1 | 0 | 0.11 |
| PX_KC-223 RECYCLE ETHANE FAN | A | 1 | 0 | 0.57 |
| PX_VD-1035D CHARGE GAS DRUM | A | 2 | 0 | 0.08 |
| PX_PP-1807C C3 RECYCLE PUMP | B | 1 | 6 | 1.47 |
| PX_HE-1372D INHIBITOR COOLER | B | 1 | 3 | 1.08 |
| PY_HE-1557D RICH AMINE EXCHANGER | B | 1 | 2 | 1.08 |
| PY_HE-685B SPENT CAUSTIC COOLER | B | 1 | 1 | 0.22 |
| PX_FCV-1569B CONTROL VALVE | B | 1 | 0 | 0.11 |
| PX_FCV-804 CONTROL VALVE | B | 1 | 0 | 0.11 |
| PX_HE-362D SEAL OIL REBOILER | B | 3 | 0 | 0.22 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 27 Aug 2026 | High | PX_KC-247A | Inspect coupling KC-247A |
| 18 Aug 2026 | Medium | PX_HE-1372D | HE-1372D fouling |
| 14 Jul 2026 | Medium | PX_KC-247A | Replace lamp as per PM finding |
| 12 Jul 2026 | Low | PX_KC-264A | Leak from packing |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 29 Jun 2026 | Low | PX_KC-247A | KC-247A high vibration |
| 04 Jun 2026 | Low | PX_KC-247A | KC-247A bearing temp high |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 12 May 2026 | Medium | PX_PP-1807C | Install scaffolding at PP-1807C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Jul 2026 | 1 | 201000028383 | Corrective |
| 05 Apr 2026 | 2 | 201000010228 | Corrective |
| 06 Jan 2026 | 4 | 201000028375 | Corrective |
| 15 Dec 2025 | 2 | 201000004998 | Corrective |
| 12 Dec 2025 | 1 | 201000021748 | Corrective |
| 08 Dec 2025 | 1 | 201000023597 | Corrective |
| 02 Sept 2025 | 8 | 201000038779 | Corrective |
| 31 Aug 2025 | 2 | 203000006603 | Turnaround |
| 12 Jun 2025 | 2 | 204000029365 | Preventive |
| 26 May 2025 | 2 | 205000017205 | Other maintenance |