Sparely
DU

GASKET,SHEET,1/4IN,600#,PTFE

Material 4100014371 · GASKET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100014371
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (12 of 27 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 14 EA/year: 14 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~31 days; expected demand during lead time 1.2.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 25.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 25 now.
  • 6.Installed on 27 FuncLoc(s), 12 of them criticality A/B.
  • 7.ML early warning: 65% probability of demand in the next 90 days.
Proposed purchase requisition
25 EA
Rp 5.4M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)ML early warningAbnormal consumptionPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
15 / 22
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 9
Rec. Max
25
order qty 15
Service level
100.0%
stockout risk now 38%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 65% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 86 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 9 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 27 functional locations

12 with criticality A/B · 30 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-247A
SLOP OIL FAN
A194.00
PX_PRV-769B
SAFETY VALVE PP-1619A
A110.04
PX_FCV-588
COOLING WATER FLOW CONTROL
A100.11
PX_KC-223
RECYCLE ETHANE FAN
A100.57
PX_VD-1035D
CHARGE GAS DRUM
A200.08
PX_PP-1807C
C3 RECYCLE PUMP
B161.47
PX_HE-1372D
INHIBITOR COOLER
B131.08
PY_HE-1557D
RICH AMINE EXCHANGER
B121.08
PY_HE-685B
SPENT CAUSTIC COOLER
B110.22
PX_FCV-1569B
CONTROL VALVE
B100.11
PX_FCV-804
CONTROL VALVE
B100.11
PX_HE-362D
SEAL OIL REBOILER
B300.22

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
27 Aug 2026HighPX_KC-247AInspect coupling KC-247A
18 Aug 2026MediumPX_HE-1372DHE-1372D fouling
14 Jul 2026MediumPX_KC-247AReplace lamp as per PM finding
12 Jul 2026LowPX_KC-264ALeak from packing
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
29 Jun 2026LowPX_KC-247AKC-247A high vibration
04 Jun 2026LowPX_KC-247AKC-247A bearing temp high
13 May 2026LowPX_KT-447KT-447 trip test
12 May 2026MediumPX_PP-1807CInstall scaffolding at PP-1807C

Recent goods issues

Posting dateQtyOrderOrder type
07 Jul 20261201000028383Corrective
05 Apr 20262201000010228Corrective
06 Jan 20264201000028375Corrective
15 Dec 20252201000004998Corrective
12 Dec 20251201000021748Corrective
08 Dec 20251201000023597Corrective
02 Sept 20258201000038779Corrective
31 Aug 20252203000006603Turnaround
12 Jun 20252204000029365Preventive
26 May 20252205000017205Other maintenance