GASKET,RING,1-1/2IN,600#,GRAPHITE

Material 4100014387 · GASKET · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100014387
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (14 of 23 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
KARYA MANDIRI PRATAMA PT
Lead time
24 d · P80 32 d
Unit price
Rp 477,234

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 22 EA/year: 22 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~24 days; expected demand during lead time 1.5.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 32.
  • 5.On hand 3 + on order 0 is at or below the reorder point: order 29 now.
  • 6.Installed on 23 FuncLoc(s), 14 of them criticality A/B.
  • 7.ML early warning: 95% probability of demand in the next 90 days.
Proposed purchase requisition
29 EA
Rp 13.8M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Safety-critical (SCE)ML early warningLast turnaround used 22Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 9
Rec. Max
32
order qty 22
Service level
99.9%
stockout risk now 36%
Unit price
Rp 477,234
PO history
ML early warning: 95% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 1 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (22 units) excluded from the baseline.

Demand pattern Intermittent · 10 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 23 functional locations

14 with criticality A/B · 27 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_PRV-1095
SAFETY VALVE HE-1986B
A110.04
PX_PCV-380
HE-1557D PRESSURE CONTROL
A100.08
PX_TCV-514
HE-1904A TEMP CONTROL
B120.98
PX_1-IA-29355-A11A-T
PIPE-1 FROM PP-1101A TO PP-1536B
B300.01
PX_HE-1741B
SPENT CAUSTIC COOLER
B100.22
PX_PP-157A
RICH AMINE PUMP
B300.19
PX_PP-841B
COOLING WATER PUMP
B100.19
PX_VD-1523
FUEL OIL KO DRUM
B100.08

Lead time and procurement

Lead time 24 ± 13 days (PO history, 7 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
26 Aug 2026PR03
Regular replenishment
21Rp 451,54803 Sept 20268 d
23 Jul 2026PR06
Regular replenishment
16Rp 474,63901 Aug 20269 d
18 Jun 2026PR03
Regular replenishment
18Rp 477,23418 Jul 202630 d
26 May 2026PR05
Project / turnaround
13Rp 480,29029 Jun 202634 d
20 May 2026PR03
Regular replenishment
10Rp 468,75305 Jun 202616 d
12 Apr 2026PR05
Project / turnaround
19Rp 482,44114 May 202632 d
08 Oct 2025PR03
Regular replenishment
7Rp 478,36430 Oct 202522 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
15 Apr 2026LowPX_TCV-514Leak from packing
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202610201000000813Corrective
16 Jul 20263201000025691Corrective
16 Apr 20262201000012582Corrective
29 Dec 20252203000006078Turnaround
14 Dec 20254201000009664Corrective
10 Dec 20251201000010676Corrective
24 Nov 20251201000020442Corrective
22 Nov 20258203000037311Turnaround
13 Nov 20256201000024602Corrective
05 Nov 202512203000033996Turnaround
12 Oct 20251201000024621Corrective
13 Jul 20252201000012415Corrective
25 May 20253201000006854Corrective