GASKET,RING,1-1/2IN,600#,GRAPHITE
Material 4100014387 · GASKET · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100014387
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (14 of 23 FuncLocs A/B, 4 safety/shutdown valve)
- Supplier
- KARYA MANDIRI PRATAMA PT
- Lead time
- 24 d · P80 32 d
- Unit price
- Rp 477,234
Recommendation
- 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 22 EA/year: 22 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~24 days; expected demand during lead time 1.5.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 32.
- 5.On hand 3 + on order 0 is at or below the reorder point: order 29 now.
- 6.Installed on 23 FuncLoc(s), 14 of them criticality A/B.
- 7.ML early warning: 95% probability of demand in the next 90 days.
Proposed purchase requisition
29 EA
Rp 13.8M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Safety-critical (SCE)ML early warningLast turnaround used 22Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 9
Rec. Max
32
order qty 22
Service level
99.9%
stockout risk now 36%
Unit price
Rp 477,234
PO history
ML early warning: 95% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 1 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (22 units) excluded from the baseline.
Demand pattern Intermittent · 10 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 23 functional locations
14 with criticality A/B · 27 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
| PX_PRV-1095 SAFETY VALVE HE-1986B | A | 1 | 1 | 0.04 |
| PX_PCV-380 HE-1557D PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_TCV-514 HE-1904A TEMP CONTROL | B | 1 | 2 | 0.98 |
| PX_1-IA-29355-A11A-T PIPE-1 FROM PP-1101A TO PP-1536B | B | 3 | 0 | 0.01 |
| PX_HE-1741B SPENT CAUSTIC COOLER | B | 1 | 0 | 0.22 |
| PX_PP-157A RICH AMINE PUMP | B | 3 | 0 | 0.19 |
| PX_PP-841B COOLING WATER PUMP | B | 1 | 0 | 0.19 |
| PX_VD-1523 FUEL OIL KO DRUM | B | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 24 ± 13 days (PO history, 7 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Aug 2026 | PR03 Regular replenishment | 21 | Rp 451,548 | 03 Sept 2026 | 8 d |
| 23 Jul 2026 | PR06 Regular replenishment | 16 | Rp 474,639 | 01 Aug 2026 | 9 d |
| 18 Jun 2026 | PR03 Regular replenishment | 18 | Rp 477,234 | 18 Jul 2026 | 30 d |
| 26 May 2026 | PR05 Project / turnaround | 13 | Rp 480,290 | 29 Jun 2026 | 34 d |
| 20 May 2026 | PR03 Regular replenishment | 10 | Rp 468,753 | 05 Jun 2026 | 16 d |
| 12 Apr 2026 | PR05 Project / turnaround | 19 | Rp 482,441 | 14 May 2026 | 32 d |
| 08 Oct 2025 | PR03 Regular replenishment | 7 | Rp 478,364 | 30 Oct 2025 | 22 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
| 15 Apr 2026 | Low | PX_TCV-514 | Leak from packing |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 02 Apr 2026 | Medium | PX_KT-397A | Follow up after steam upset KT-397A |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 10 | 201000000813 | Corrective |
| 16 Jul 2026 | 3 | 201000025691 | Corrective |
| 16 Apr 2026 | 2 | 201000012582 | Corrective |
| 29 Dec 2025 | 2 | 203000006078 | Turnaround |
| 14 Dec 2025 | 4 | 201000009664 | Corrective |
| 10 Dec 2025 | 1 | 201000010676 | Corrective |
| 24 Nov 2025 | 1 | 201000020442 | Corrective |
| 22 Nov 2025 | 8 | 203000037311 | Turnaround |
| 13 Nov 2025 | 6 | 201000024602 | Corrective |
| 05 Nov 2025 | 12 | 203000033996 | Turnaround |
| 12 Oct 2025 | 1 | 201000024621 | Corrective |
| 13 Jul 2025 | 2 | 201000012415 | Corrective |
| 25 May 2025 | 3 | 201000006854 | Corrective |