GASKET,SW,3IN,600#,GR/304
Material 4100014412 · GASKET · Plant 1000
ASafety-criticalMaintainHealthy
- Material
- 4100014412
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (11 of 17 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 27 d · P80 35 d
- Unit price
- Rp 50,562
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 31 EA/year: 30 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
- 3.Lead time ~27 days; expected demand during lead time 2.3.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 16, order up to 48.
- 5.Installed on 17 FuncLoc(s), 11 of them criticality A/B.
- 6.ML early warning: 44% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
26 / 7
next delivery 04 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
16
safety stock 14
Rec. Max
48
order qty 32
Service level
100.0%
stockout risk now 0%
Unit price
Rp 50,562
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 67 days ago, 24 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 17 functional locations
11 with criticality A/B · 18 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_HE-1483A C4 PRODUCT COOLER | A | 1 | 11 | 3.22 |
| PX_KC-479C DILUTION STEAM COMPRESSOR | A | 1 | 5 | 2.71 |
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
| PY_VD-281A PROPYLENE SURGE DRUM | A | 1 | 1 | 0.08 |
| PX_CL-1833 CHARGE GAS COLUMN | A | 1 | 0 | 0.38 |
| PX_HE-726A SLOP OIL EXCHANGER | A | 2 | 0 | 0.22 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_PP-641A GASOLINE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-479 SEAL OIL PUMP | B | 1 | 10 | 2.76 |
| PX_FCV-727 LUBE OIL FLOW CONTROL | B | 1 | 0 | 0.11 |
| PX_3/4-HS-2612-B22A-T PIPE-3/4 FROM VD-240B TO KC-264A | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 27 ± 12 days (PO history, 6 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Aug 2026 | PR06 Regular replenishment | 7 | Rp 50,106 | 04 Oct 2026 open | 36 d |
| 27 Jun 2026 | PR06 Regular replenishment | 8 | Rp 50,795 | 15 Jul 2026 | 18 d |
| 31 May 2026 | PR06 Regular replenishment | 8 | Rp 50,329 | 05 Jul 2026 | 35 d |
| 28 Apr 2026 | PR03 Regular replenishment | 7 | Rp 50,168 | 31 May 2026 | 33 d |
| 05 Nov 2025 | PR06 Regular replenishment | 6 | Rp 50,983 | 18 Nov 2025 | 13 d |
| 15 Jul 2025 | PR03 Regular replenishment | 8 | Rp 51,192 | 02 Aug 2025 | 18 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Emergency | PX_KC-538 | KC-538 high vibration |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 23 Sept 2026 | Medium | PX_HE-1483A | HE-1483A fouling |
| 16 Sept 2026 | Emergency | PX_KC-538 | Leak from packing |
| 12 Sept 2026 | Medium | PX_PP-479 | Install scaffolding at PP-479 |
| 10 Sept 2026 | Medium | PX_KC-479C | KC-479C bearing temp high |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 01 Sept 2026 | Medium | PX_KC-538 | KC-538 lube oil filter DP high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jul 2026 | 1 | 201000000351 | Corrective |
| 27 Jan 2026 | 3 | 201000018107 | Corrective |
| 04 Dec 2025 | 5 | 201000009221 | Corrective |
| 14 Nov 2025 | 2 | 201000005014 | Corrective |
| 06 Nov 2025 | 8 | 201000030352 | Corrective |
| 16 Aug 2025 | 4 | 201000001187 | Corrective |